Weil-McLain Ultra 105 Quick Start Manual Download Page 4

TRIM OFF HERE

Ultr

a mo

del

Ven

t or air pip

e siz

e

• Allowable sizes of vent/air piping  • Max. equivalent feet of each

 

• Number of elbows allowed at these lengths

 

(All applications include allowance for the termination.)

Sidewall 

Direct Vent 

with 

Weil-McLain 

Vent/air cap

Sidewall Direct Vent 

with  

Separate Pipes  

— or —

Sidewall or Vertical

Direct Exhaust

Sidewall or Vertical

Direct Vent

3” PVC Concentric

(Use only PVC pipe DO  

NOT use CPVC or ABS)  

[Note 1]

 

Sidewall or Vertical

Direct Vent

4” PVC Concentric

(Use only PVC pipe DO  

NOT use CPVC or ABS)  

[Note 1]

 

Vertical 

Direct Vent 

with  

Separate 

Pipes

Length Ells

Length

Ells

Length

Ells

Length

Ells Length Ells

80 or 

105

2” ** 100 

(ab)

2

100

2

100 

(ab)

1

NA

100 

(a)

1

3”

100

2

100

2

100

1

NA

100

1

155

3”

100

2

100

2

100

1

NA

100

1

230

3”

30 

(c)

2

30 

(c)

2

30 

(c)

1

30 

(c)

1

30 

(c)

1

4” 100 

(d)

2

100

2

70 

(d)

1

70 

(d)

1

100

1

299

4”

100

2

100

2

70 

(d)

1

100

1

100

1

399

4”

100

2

100

2

NA

100

1

100

1

Equivalent feet for elbows — deduct from maximum equivalent length of piping:

•  7 feet per for each 4-inch elbow & 2 or 3-inch 90° long-radius or 45° elbow

 

•  16 feet for each 2- or 3-inch short-radius elbow

a  — 

Use 3"x2" reducer at boiler

b  — 

Use 3”x2” PVC reducers at termination

c  — 

Use 4”x3” reducer at boiler

d  — 

Use 4"x3" PVC reducers at termination

Stainless (AL29-4C) vent pipe

 — install an adapter at the boiler for all applications. Also install an 

adapter at the termination unless using separate-pipe termination.

**  Ultra-80 and 105 boilers installed with 2-inch vent piping automatically derate due to the pres-

sure loss in the vent and air piping. The derate ranges up to 10% for the Ultra-80 at 100 feet or 

15% for the Ultra-105 at 100 feet.

Note 1:  IPEX 3” and 4” PVC concentric vent kits can be used with standard PVC pipe, fittings and 

cement (ANSI/ASTM D1785) except where ULC S636 compliance is required. For ULC S636 compli-

ance, all pipe, fittings and cement must be IPEX System 636. When using IPEX kits, use only IPEX 

product code 196006 for 3” venting or IPEX product code 196021 for 4” venting.
Contact Weil-McLain for ordering information and availability of Weil-McLain venting kits.

Items

Material

Standards for installations in:

United States

Canada

PLASTIC

 piping materials (vent or air piping)

Pipe  

Fittings

PVC schedule 40

ANSI/ASTM

D1785

Plastic vent pipe 

must be certified 

to ULC S636 when 

required. 

(Note 2)

 

Air pipe can be 

any of those 

listed at left if 

acceptable for 

local codes.

PVC-DWV 

(Note 1)

D2665

CPVC sch 40 

(Note 1)

F441

ABS-DWV sch 40 

(Note 1)

D2661

Cement

PVC

D2564

CPVC 

(Note 1)

F493

ABS 

(Note 1)

D2235

Primer

PVC, CPVC or ABS

F656

AL29-4C

 piping materials

Vent  

pipe

Heat Fab, Inc. Saf-T-Vent

®

Z-Flex, Inc. Z-Vent II
Simpson Dura-Vent FasNSeal

Certified for Category IV and 

direct vent appliance venting

Note 1: 

DO NOT use DWV, CPVC or ABS when using concentric vent ter-

mination. Use ONLY PVC schedule 40.

Note 2: 

IPEX PVC concentric terminations utilize PVC pipe/fittings certified 

to ULC S636. Where ULC S636 compliance is required, use only IPEX 

System 636 pipe, fittings and cement.

  AL29-4C vent piping — Install a PVC-to-stainless adapter supplied 

by the vent pipe manufacturer at the boiler vent connection and 

at the termination (when using Weil-McLain plate or concentric 

PVC termination). DO NOT mix piping from different vent pipe 

manufacturers unless using adapters specifically designed for the 

purpose by the manufacturer.

 

Plastic piping — Do not attempt to connect different types of 

plastic piping together.

 

DO NOT use cellular core pipe.

 

All vent and air pipes require a bird screen at each termination 

where specified in the manual or vent supplement. 

Material checklist — vent and air piping

NOTE:   Also obtain all required flashings, boots, thimbles, fire stops or 

other items required for wall, ceiling and roof penetrations.

QUICK-START

QUICK-START

Pipe and fittings — PLASTIC

Material —

PVC   

CPVC   

ABS   

Size —

  2”   

  3”   

  4”   

ITEM

QTY

Straight pipe

feet

 

Elbows, 90-degree 

(include termination elbows if required)

 

Couplings 

(include termination if vertical separate pipes)

 

Return bend, 180-degree 

(vertical separate-pipe termination)

1

 

Reducers:     3"x2" 

            4"x3" 

 

Pipe and fittings — AL29-4C Stainless

Product —

Saf-T-Vent

®

 

Z-Vent II   

FasNSeal™ 

 

Size —

  2”   

  3”   

  4”   

ITEM

QTY

Straight pipe

feet

 

Adjustable lengths

 

Elbows, 90-degree

 

Termination elbows (with integral screen), when req’d

 

Elbows, 45-degree

 

Adapter at boiler (to fit diameter of boiler connection)

 

Adapter at termination, if required

 

Items required 

(DV=Direct Vent; DE=Direct Exhaust)

W-M P/N

QTY

Sidewall with Weil-McLain Plate

W-M sidewall term. kit        3" 

• 

   

      4"

383-500-397 

383-500-398

1

Included

 

with boiler

Includes W-M sidewall vent/air termination cap and 

inside/ outside cover plates and mounting hardware; 

openings are sized for PVC pipe.
3" cap is shipped with Ultra-80–155. 

4” cap is shipped with Ultra-230–399.

Sidewall DV with separate pipes or DE (elbow)

Inside and outside cover plates and mounting 

hardware supplied with boiler can be used at wall 

penetrations if size is the same as the pipe used. (Cut 

plates to size for direct exhaust applications.)

 

Bird screens 

3" 

• 

(

For 2” pipe, trim 3” bird screen to size

)

  4"

383-500-105 

383-500-110

1 DE 
2 DV

 

Vertical DV with separate pipes or DE (coupling)

Bird screens 

3” 

• 

(

For 2” pipe, trim 3” bird screen to size

)

  4”

383-500-105 

383-500-110

1 DE 
2 DV

 

Coupling (1)

• 

Add to the table at right

180-

• 

degree return bend

 (1) (DV only)

Add to the table at right

3" or 4”  PVC concentric termination, sidewall or vertical

Standard C. T. kit, 3" 

• 

S636 compliant C. T. kit, 3” 

• 

S636 compliant C. T. kit, 4”

383-500-350 

Consult factory

Consult factory

 

1

 

Reducers: 3”x2” 

• 

 

 

  4”x3” 

 

 

Add to the table at right

 

Fold out the opposite page to see venting details.

33

Reviews: