Weil-McLain Ultra 105 Quick Start Manual Download Page 3

TRIM OFF HERE

VENT & AIR PIPING

(see boiler manual for details)

Slide  the  air  inlet  pipe  and  vent  pipe  into  the  boiler  top 

openings. Just tighten the restraining rings — no messy sealants 

required. Reducers or adapters are required when the vent / air 

pipe O. D. is different from the boiler connection diameter (see 

below). All AL29-4C stainless pipe applications require adapters 

made by the vent pipe manufacturer. See the material checklist 

for items required.

Ultra boilers can be sidewall vented or vertically vented as shown 

in the five options below and in the manual. Choose either direct 

vent (D. V. — requires air pipe for combustion air) or direct exhaust 

(D. E. — uses inside air) as shown.

Make  sure  the  terminations  are  placed  as  required  in  the 

manual and that air intakes are at least 12 inches above normal 

snow line.

Vertical D. V. 

Concentric Pipes 

termination

Requires kit

Vertical  

Direct Exhaust 

(no air pipe) 

–or– 

 Vertical Direct Vent with  

Separate Pipes  

termination

Requires bird screen(s)

Sidewall D. V. 

with Weil-McLain 

termination

Included with boiler

Sidewall Direct Exhaust 

(no air pipe) 

–or– 

Sidewall Direct Vent with Separate Pipes 

termination

Requires bird screen(s)

Sidewall D. V. with 

Concentric Pipes 

termination

Requires kit

33

Support pipes as 
described in the 
manual.

Vent / air pipe size options (PVC sizes):

Ultra-80, 105:  2" or 3”

Ultra-155:  3"

Ultra-230:  3" or 4”

Ultra-299, 399:  4”

Slope pipes ¼”

 per 

foot t

owar

d boiler

.

Direct Exhaust

Direct Vent

Reviews: