Weil-McLain Ultra 105 Quick Start Manual Download Page 2

BEFORE INSTALLING . . .

Make sure there is enough clearance for the boiler and all 

• 

water, gas and air piping. Verify vent/air termination can 

be located as required.
All models are shipped with the items needed for propane 

• 

conversion except the Ultra-80, which requires a separate 

conversion kit (see material checklist).
When wall mounting the boiler, obtain the wall-mount kit 

• 

(see material checklist).

START-UP, ADJUST & TEST

Follow the boiler manual instructions to clean the system 

• 

if needed, then fill and check water chemistry.

Start up the boiler as directed in the manual. Use a 

• 

combustion analyzer where specified.

88

INSTALL CONDENSATE PIPING / 

TUBING AND COMPONENTS

Fill out the material checklist in this guide to ensure you 

• 

have the tubing or PVC pipe and all components you will 

need for the condensate piping.

Connection tee and internal components are supplied 

• 

with the boiler.

44

INSTALL GAS PIPING

Install a union and shutoff valve.

• 

No external drip leg is needed — it is already included in 

• 

the boiler’s internal gas piping.

55

66

WIRE THE BOILER

Connect power wiring and control wiring per boiler 

• 

manual wiring diagram.

Connect system and DHW circulator wiring to the 

• 

terminals designated in the boiler manual.

INSTALL VENT & AIR PIPING

See vent / air piping options at left. 

• 

Refer to the material checklist in this guide for a list of 

• 

items needed.

INSTALL WATER PIPING

See information at right.

• 

Refer to the material checklist in this guide for a list of 

• 

items needed.

Steps  2  –  6  can  be  done  in  any  order  — 

just make sure that air, vent, water and gas 

pipes will not interfere with one another.

77

Choose pre-loaded boiler settings, or customize settings 

• 

for various applications.

22

33

(Follow all instructions in Boiler manual)

QUICK-START

QUICK-START