26. Wrap the High Cable (55) under a 90mm Pulley

(48). Attach the Pulley, a Cable Trap (51), and
two Half Finger Guards (43) at the upper hole in
the “U”-bracket (45) with an M10 x 51mm Bolt
(66) and an M10 Nylon Locknut (56). 

Make sure

the Cable Trap is oriented to hold the Cable in
the groove of the Pulley and that the Finger
Guards are on the outside of the “U”-bracket.

28. Route the High Cable (55) over a 90mm Pulley

(48) and down through the Top Frame (4). Attach
the Pulley inside of the Top Frame with an M10 x
67mm Bolt (71), two M10 Washers (57), two
12mm Spacers (52), and an M10 Nylon Locknut
(56).

29. Thread an M12 Nut (84) all the way onto the High

Cable (55). Place a Large Washer (85) on top of
the Weight Tube (24).

Tighten the High Cable (55) into the Weight Tube
(24) until all the slack is removed from the cables.
Tighten the M12 Nut (84) against the Large
Washer (85).

27. Route the High Cable (55) up through the Top

Frame (4) and over a 90mm Thin Pulley (47).
Attach the Pulley inside of the Top Frame with the
M10 x 67mm Bolt (71) used in step 25, an 11mm
Spacer (49), an M10 Washer (57), and an M10
Nylon Locknut (56).

26

27

28

29

66

51

56

48

55

43

43

45

55

47

71

71

4

49

57

56

55

52

52

48

57

4

57

56

55

84

85

24

11

14. Route the Arm Cable (54) over a “V”-pulley (46).

Attach the “V”-pulley, a Large Cable Trap (50),
two Full Finger Guards (41), and an M10 Washer
(57) to the Upright (3) with an M10 x 63mm Bolt
(75) and an M10 Nylon Locknut (56). 

Make sure

the Cable Trap is oriented to hold the Cable in
the groove of the “V”-pulley.

16. Route the Arm Cable (54) over a “V”-pulley (46).

Attach the “V”-pulley, a Large Cable Trap (50),
two Full Finger Guards (41), and an M10 Washer
(57) to the Upright (3) with an M10 x 63mm Bolt
(75) and an M10 Nylon Locknut (56). 

Make sure

the Cable Trap is oriented to hold the Cable in
the groove of the “V”-pulley.

17. Grease an M8 x 22mm Shoulder Bolt (65). Attach

the Arm Cable (54) to the indicated Cable Pivot
(39) with the Bolt and an M8 Nylon Locknut (58).

Make sure that the Cable can pivot easily
around the Bolt.

15. Route the Arm Cable (54) under a 90mm Pulley

(48). Attach the Pulley and two Half Finger
Guards (43) to the Double “U”-bracket (63) with
an M10 x 46mm Bolt (81) and an M10 Nylon
Locknut (56). 

Make sure the Finger Guards are

on the outside of the “U”-bracket as shown.

56

3

57 46

50

41

75

54

41

14

48

43

43

63

81

56

54

15

16

17

56

3

54

46

50

41

75

57

41

58

65

54

39

Grease 

Summary of Contents for WEEVSY1975.0

Page 1: ...7 R0805A Printed in China 2005 ICON IP Inc ORDERING REPLACEMENT PARTS To order replacement parts contact the ICON Health Fitness Ltd office or write ICON Health Fitness Ltd Customer Service Department...

Page 2: ...way to increase flexibility STAYING MOTIVATED For motivation keep a record of each workout List the date the exercises performed the resistance used and the numbers of sets and repetitions completed R...

Page 3: ...that is right for you stick with it EXERCISE FORM Maintaining proper form is an essential part of an effective exercise program This requires moving through the full range of motion for each exercise...

Page 4: ...the pulleys often it may have become twisted Remove the cable and re install it If the cables need to be replaced see ORDERING REPLACEMENT PARTS on the back cover of this manual 55 MAINTENANCE 4 Shro...

Page 5: ...w Cable 53 Length 128 inches 3 1 6 1 2 3 4 5 6 20 5 Assembly Requires Two Persons For your convenience and safety assemble the weight system with the help of another person Set Aside Enough Time Due t...

Page 6: ...box on page 5 Refer to the PART IDENTIFICATION CHART in the centre of this manual for help identifying small parts Frame Assembly 1 1 78 78 2 78 56 58 3 1 58 71 71 2 57 57 21 Holes 21 WEIGHT RESISTANC...

Page 7: ...1 with the two indicated M8 x 63mm Carriage Bolts 78 and two M8 Nylon Locknuts 58 Do not tighten the Locknut yet Attach the Leg Bumper 60 to the Front Leg 7 with an M4 x 20mm Self tapping Screw 69 an...

Page 8: ...ld be attached between the Handle Strap and the Cable with two Cable Clips Adjust the length of the Chain between the Handle Strap and the Cable so that the Handle Strap is in the correct starting pos...

Page 9: ...8 Attach the Shroud 17 to the Top Frame 4 with two M6 x 16mm Screws 62 and two M6 Washers 82 Attach the Shroud 17 to the brackets on the Stabiliser 2 with two M6 x 16mm Screws 62 and two M6 Washers 82...

Page 10: ...the inside of a Large Foam Pad 42 with soapy water Slide the Large Foam Pad onto the Right Arm 9 Attach the lower end of a Handle 11 to the Right Arm 9 with an M10 x 45mm Button Bolt 77 and an M10 La...

Page 11: ...0 Nylon Locknut 56 26 27 28 29 66 51 56 48 55 43 43 45 55 47 71 71 4 49 57 56 55 52 52 48 57 4 57 56 55 84 85 24 11 14 Route the Arm Cable 54 over a V pulley 46 Attach the V pulley a Large Cable Trap...

Page 12: ...Cable so that only two threads are showing above the nut 22 23 24 25 53 48 43 1 43 81 56 53 45 58 58 45 59 53 56 4 55 52 52 57 57 48 71 4 55 49 57 47 71 12 18 Locate the Low Cable 53 Route the Cable t...

Page 13: ...1 Top Cap 19 1 Left Cap 20 1 Right Cap 21 2 Weight Guide 22 6 Weight 23 1 Weight Tube Cap 24 1 Weight Tube 25 1 Top Weight 26 1 Weight Pin 27 2 Weight Bumper 28 4 Small Foam Pad 29 1 Pad Tube 30 9 50...

Page 14: ...57 57 57 77 80 77 80 56 56 82 82 52 52 52 52 92 92 1 2 3 30 30 26 22 27 27 21 57 56 57 24 23 25 85 84 55 74 56 55 48 30 52 57 71 47 52 57 56 4 56 57 57 49 52 48 30 52 49 57 57 71 18 17 62 53 43 66 43...

Reviews: