36. Tap a 1 3/4” x 1 3/4” Inner Cap (24) into the Leg
Lever (62).
Lubricate a 3/8” x 2 3/4” Bolt (81). Attach the Leg
Lever (62) to the Squat Seat Frame (11) with the
3/8” x 2 3/4” Bolt and a 3/8” Jam Nut (2).
Insert the 3/8” x 4” Eyebolt (55) through the Leg
Lever (62) from the indicated side. Attach the
Eyebolt with a 3/8” Flat Washer (4) and a 3/8”
Jam Nut (2).
37. Align the holes in the Squat Seat Frame (11) with
one of the welded tubes on the Squat Upright
(71). Attach the Squat Seat Frame with a 5/16” x
2 3/4” Carriage Bolt (59) and the 5/16” Knob (61).
The Squat Seat can be attached at any of three
heights.
38. Tap 3/4” Round Caps (50) into the ends of both
Pad Tubes (58).
Insert the Pad Tubes (58) into the holes in the
Leg Lever (62) and the Squat Seat Frame (11).
Slide two Short Foam Pads (57) onto each Pad
Tube (58).
39. Attach the Press Seat (35) to the Press Seat
Frame (36) with four 1/4” x 1/2” Screws (37).
39
38
37
36
59
11
50
50
50
57
57
62
57
11
58
58
37
36
35
37
61
55
24
4
2
81—Lubricate
62
65
11
2
71
15
16
19
18
17
2
28
12
83
44
Rubber
Stop
Lat Bar
Bracket
4
2
13
13
12
Wide Tab
Wide Tab
90
80
42
2
44
87
87
2
14
86
86
85
85
80
9
26
26
22
23
3—Lubricate
16. Tap a 1” x 1 1/2” Inner Cap (23) into a Handle
(26). Tap a 1” Round Cap (22) into the Handle.
Apply lubricant to a 3/8” x 2 1/2” Bolt (3). Attach
the Handle (26) to the Press Arm (28) with the
Bolt and a 3/8” Jam Nut (2).
Remove the adhesive backing from a Square
Bumper (9). Apply the Square Bumper to the
Handle (26) in the indicated location.
Assemble the other Handle (26) to the Press Arm
(28) in the same manner.
17. IMPORTANT: As you assemble the cables in
steps 17 through 30, refer to the CABLE DIA-
GRAMS on pages 22 and 23, and make sure
that the cables are correctly routed.
Find the end of the Short Cable (44) where the
rubber stop is located. Lay the end of the Cable
over a 3 1/2” Pulley (12). Attach the Pulley to the
Frame (80) with a 3/8” x 3 3/4” Bolt (83), a 3/8”
Flat Washer (4), and a 3/8” Jam Nut (2). Note:
Be sure that the Short Cable is between the
Pulley and the lat bar bracket.
18. Lay the Short Cable (44) over a 3 1/2” Pulley
(12). Attach the Pulley and two Pulley Covers (13)
to the Frame (80) with the 3/8” x 4 1/2” Bolt (90)
and a 3/8” Jam Nut (2). Make sure that the
Pulley Covers are turned so the wide tabs are
positioned as shown.
See step 7. Tighten the 3/8” Jam Nut (2) used
in step 7.
19. Assemble the two 4 1/2” Pulley Covers (87), the
two “I” Plates (86), and the two 4 1/2” Pulleys (85)
with two 3/8” x 1 3/4” Bolts (14) and two 3/8” Jam
Nuts (2).
10