7�2
Installing the media line
Please note:
Subsequent mentions of descriptions and position numbers refer to
Chap-
ter 3. Product overview / product description on page 10
.
Î
Unscrew the protection cap from the port.
Î
Clamp the WEH
®
Connector in a vice with aluminium clamping jaws to mount the
media line.
Note:
The WEH
®
Connector must not be damaged during clamping.
Î
Screw the 'B1' media inlet pressure-tight to the port for the media line.
For the tightening torque, please refer to the table below.
Connection
Torque
G1/8“ female thread
10 Nm ± 2 Nm
Î
Please note the connection size marked on your product.
- Other connection sizes are available on request.
7�3
Checking the connection for leak tightness
Î
Connect the connector to a closed test piece.
Î
Slowly apply the operating pressure to the connector and media line.
Caution:
The test piece must be closed.
Î
Check the connector, the connection to the media line and the connection to the test
piece for leak tightness.
Attention:
Do not use a leak detection spray that contains ammonia, since this could
cause corrosion of the connector.
MD-10063-L51-R1.1.0-03
Page 15
Operating instructions
AE