background image

www.weg.net

WEG Molded Case Circuit Breakers - User’s Manual

11

4.  Check base, cover, and operating handle for cracks, chipping, and discoloration. 

Circuit breakers should be replaced if cracks or severe discoloration is found.

5.  Check terminals and connectors for looseness or signs of overheating. 

Overheating will show as discoloration, melting, or blistering of conductor 
insulation, or as pitting or melting of conductor surfaces due to arcing. If 
there is no evidence of overheating or looseness, do not disturb or tighten 
the connections. If there is evidence of overheating, terminations should be 
cleaned or replaced. Before reenergizing the circuit breaker, all terminations 
and cable should be refurbished to the condition when originally installed.

6.  Check circuit breaker mounting hardware, Tighten if necessary.
7.  Check area where circuit breaker is installed for any safety hazards, including 

personal safety and fire hazards. Exposure to certain types of chemicals can 
cause deterioration of electrical connections.

8.  The operation of circuit breakers with electronic trip units can be field-tested 

periodically using the Seltronic test kit.

3.7.  FIELD TESTING

Any field testing should be done in accordance with applicable NEMA Standard. 

Summary of Contents for LT1 UBW250

Page 1: ...Motors Automation Energy Transmission Distribution Coatings User s Manual WEG Molded Case Circuit Breakers UBW250...

Page 2: ...recommendations and information contained herein are based on WEG experience and judgment but should not be considered to be all inclusive or covering every application or circumstance which may aris...

Page 3: ...n Fixed thermal Adjustable thermal1 Adjustable magnetic of ln 2 UBW250 250 200 250 5 to 10 Table 1 available trip unit ratings Notes 1 Not UL listed 2 For adjustable thermal trip units the magnetic se...

Page 4: ...ternal accessories be installed at the factory in this type of circuit breaker For hardware conversion kits and handle mechanisms required to replace existing WEG circuit breakers If required internal...

Page 5: ...Care should be taken every time a thread forming screw is used to ensure the screw starts in the original threads Damaged threads can result in improper circuit breaker cover retention 4 Install cove...

Page 6: ...d equipment can cause death or severe personal injury Before mounting the circuit breaker in an electrical system make sure there is no voltage present where work is to be per formed Special attention...

Page 7: ...rcuit breaker handle Figure 6 circuit breaker escutcheon dimensions b If circuit breaker includes factory or field installed internal accessories make sure that accessory wiring can be reached when th...

Page 8: ...t breaker nameplate Terminal catalog number Terminal material body Screw head type AWG wire range Metric wire range Wire type Torque value Lb in N m LT1 UBW250 Stainless steel Socket 4 350 MCM 25 185...

Page 9: ...ermal element in the trip unit cools No circuit breaker should be reclosed until the cause of trip is known and the situation rectified 3 3 PUSH TO TRIP BUTTON The PUSH TO TRIP button checks the circu...

Page 10: ...aid to reverse feed applications to ensure no voltage is present CAUTION Make sure that cleaning agents or solvents used to clean the circuit breaker are suitable for the job Some commercial cleaning...

Page 11: ...the connections If there is evidence of overheating terminations should be cleaned or replaced Before reenergizing the circuit breaker all terminations and cable should be refurbished to the conditio...

Page 12: ...hone 233 30 2766490 info zestghana com gh INDIA Bangalore Karnataka Phone 91 80 41282007 info in weg net Hosur Tamil Nadu Phone 91 4344 301577 info in weg net ITALY Cinisello Balsamo Milano Phone 39 2...

Reviews: