7
D. Install parts of extension columns
(See Fig. 14).
E. Position powerside column
Lay down two columns on the installation site paralleled, position the power-side
column according to the actual installation site. Usually, it is suggested to install
power-side column on the front-right side from which vehicles are driven to the lift.
This lift is designed with 2-Section columns. Adjustable height according to the ceiling
height and connecting the inner and extension columns.
W10-HD: Not suitable for installation when the height of the workshop is less than
143-4 / 4 "; only low setting installation for height between 143-5 / 4" -151-5 / 8 ";
the height of the workshop is greater than 151 -5/8 ", installation can be in both high
and low setting;
Fig. 14
26
37
25
24
23
41
42
Summary of Contents for W10-HD
Page 1: ......
Page 17: ...14 J Lift the carriages up and make them be locked at the same level See Fig 23 Fig 23...
Page 20: ...17 2 2 Connecting cable for high setting See Fig 26 Fig 26 85 84 Cable 1 Cable 2 Cable 2...
Page 21: ...18 L Install oil hose See Fig 27 Fig 27...
Page 27: ...24 IV EXPLODED VIEW Fig 40...
Page 40: ......