139-6979 

IP66/67

M20: 0.236 – 0.512 in

M16: 0.177 – 0.394 in

7.86

9.04

4.73

Class I, ta = 25 °C

Weight  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2.6 lb

139-6978 

For connecting 4 x FLC210-CC, max. 50 W, 480 mA in 
Color Boost constant current, 2 – 55 V SELV, max. 80 ft 
to the lights with a total of 18 AWG cable cross-secti-
on, or 3 x FLC210-CC [PP], max. 50 W, 200 mA in Color 
Boost constant current, 2 – 55 V SELV, max. 80 ft to the 
luminaires with a total of 18 AWG cable cross-section.

Tools required 

– Cross Screwdriver 

 

Installation Procedure

1)  Open the driver box by loosening the 4 fastening 

screws. 

2)  Fasten the driver box to the mounting surface 

with suitable fastening material.

 

ATTENTION:

 Ensure not to damage any electric 

cable, water pipe or other devices while drilling 
holes.

3)  Switch off the mains electrical supply.

4)  Connect cable via main cable gland and connect 

to the appropriately marked terminals. 
For through-wiring version, an additional screw 
connection can be used. To do this, remove the 
sealing plug in the additional screw connection.

5)  A separate Input and Output is provided. When 
  looping through the control, remove the sealing 
  plug from the screw connection. 

6)  For connecting the luminaires, please note the 
  wiring instructions that are enclosed with the 
 luminaires.

7)  Close the driver box and tighten the fastening 
 screws!

Mains connection 3 x 18 AWG

Luminaire connection 9 x 18 AWG

Luminaire connection 

See assembly instruc- 
tions luminaire

L  = Phase 
N = Neutral conductor
  = Protective conductor
+  = DMX + 
-  = DMX - 
S  = Shield

Connection without wiring

Connection for through-wiring

Luminaire connection

Mains connection

DMX In 2 pol. + Shield

DMX In

DMX Out

Mains connection
Luminaire connection

DMX In
DMX Out

DMX Out 2 pol. + Shield

2.95

Summary of Contents for FLC210 LED

Page 1: ...ance Instructions for Projector FLC210 LED FLC210 LED Profile Projector Notice In case the luminaire is equipped with an optio nal available surge protector the function can get tested if the signal L...

Page 2: ...n Attention Switch off mains electrical supply prior to installing and connecting the luminaire Do not open luminaire while mains supply is switched on Notice If the luminaire is modified by anybody o...

Page 3: ...12 17 IP66 FLC210 LED 120 277V 60 Hz 139 XXXX SOE XXXXXXX LED 3000K XXW item no XXX G D C B 5 Feed mains supply cable D through cable gland E 8 8 0 10V ON OFF L N L N D D E F 6 Connect to the corresp...

Page 4: ...ft distance O R Q Y T1 T2 T3 N Only for PP Version 2 1 Gobo projector GP Pull the gobo cassette out of the gobo holder Loosen screw P on the gobo cassette unfold the cassette and place gobo M motif up...

Page 5: ...in lb M10 max 23 Nm 203 6 in lb Cable glands M16 max 1 5 Nm 13 3 in lb 8 Reposition gear box cover B and tighten screws C evenly 45 30 15 G 9 Loosen the two screws G slightly Aim luminaire see illust...

Page 6: ...4 3 4 5 4 7 4 9 4 2 4 4 4 8 1 1 1 3 1 5 1 7 1 9 1 2 1 4 1 8 1 6 R R G G B B W W 1 3 5 6 7 4 1 4 2 4 3 4 5 4 4 1 1 1 2 1 3 1 5 1 4 1 1 1 2 1 3 1 5 1 4 C C W W Terminal assignment Luminaire 3 Terminal...

Page 7: ...t legislation Notice If the luminaire is modified by anybody other than the original manufacturer then the warranty will no longer be valid and shall become the full responsibility of the modifying pe...

Page 8: ...off the mains electrical supply 4 Connect cable via main cable gland and connect to the appropriately marked terminals For through wiring version an additional screw connection can be used To do this...

Page 9: ...ains electrical supply 4 Connect cable via main cable gland and connect to the appropriately marked terminals For through wiring version an additional screw connection can be used To do this remove th...

Reviews: