We Care Solar - Solar Suitcase Installation Guide - 2017
Page | 67
Knows to re-run the cables for the lights through the hole in top of box for
permanent installation and that light cables have comfort loop.
Knows how to use the M12 connectors, that it is both plug and screw operation
Knows how to consider where to mount the lights so that they reach the solar
suitcase AND that they provide light where it is most useful.
Knows several ways to attach the lights to the wall and manage the cables. You
can be creative.
Knows how to locate ceiling framing or adequate bite into ceiling material to make a
secure mounting of the light
Knows how and where to mount expansion switch box
Knows the final touches of the Solar Suitcase installation:
•
Install the grey plug at top of Suitcase
•
Stress relief at top of suitcase
•
Comfort loop for light cables
•
Fill in paper work (equipment receipt, certificate), battery sticker and
Suitcase sticker with contact information
•
Brush out dust and debris after installation
•
Attach poster to wall
Please visit
https://wecaresolar.org/resources/product-info/
for training videos on Solar Suitcase installation, use, maintenance, and repair.
Artwork in this manual courtesy of: