
2.
☐
Replace Any Parts That Have Failed
3.
☐
Inspect/Clean Injectors and Brine Line
4.
☐
Photograph System for Job Folder
5.
☐
Record Pentair Serial Number
6.
☐
Perform Any Work Covered by Warranty (If Applicable, see notes)
7.
☐
Include 12 postage-paid water sample bottles per year, plus testing by WCC lab (if needed) (Results will include testing for
hardness, iron, TDS, pH)
8.
☐
Re-Examine Water Quality Levels (Hardness)
Notes:
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
Billing Information
Name:
__________________________________________________________________________________________________________________
Phone:
__________________________________________________________________________________________________________________
Street:
__________________________________________________________________________________________________________________
City/State/Zip: ____________________________________________________________________________________________________________
Purchase Order #: _________________________________________________________________________________________________________
Acceptance of Work
:
Tech. Signature: ___________________________________________________________________________________________________________
Client Printed: ____________________________________________________________________________________________________________
Client Signature: __________________________________________________________________________________________________________
Water Control Corporation
7150 143rd Ave NW
•
Ramsey, MN 55303
Phone: 763-427-9638
•
Fax: 763-427-5665
www.watercontrolinc.com
WCC MAINTENANCE PROCEDURES | PAGE 2/2
Summary of Contents for EF Series
Page 20: ...Breaking a Salt Bridge...
Page 28: ......