background image

18

Please Do Not Return This Product To The Store. 

Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 

local yellow pages/business listings or go to the 

Find a Dealer

 section online at 

www.wayne-dalton.com

Tools Needed:

18

none

Torsion Spring assembly

imPoRTaNT: 

RIGhT AND LEFT hAND IS 

ALWAYS DETERMINED FROM INSIDE ThE 

GARAGE LOOKING OUT. 

NoTe:

 Identify the springs provided as either 

right hand wound (red winding cone), which 

goes on the LEFT hAND SIDE or left hand 

wound (black winding cone), which goes on 

the RIGhT hAND SIDE.

Facing the inside of the door, lay the torsion 

tube on the floor. Lay the spring with the 

black color coded winding cone and the 

black color coded cable drum, at the right 

hand end of the tube. Lay the spring with the 

red color coded winding cone and the red 

color coded cable drum, at the left hand end 

of the tube.

NoTe:

 The set screws used on all torsion 

counterbalance winding cones and cable 

drums, are now colored red. DO NOT identify 

right and left hand by the set screw color. 

Slide the nylon center bushing onto the 

torsion tube followed by the springs and 

cable drums. The nylon center bushing, 

springs and cable drums must be positioned, 

as shown.

With assistance, pick up the torsion 

assembly and slide one end of the tube 

through one end bearing bracket. Lay the 

torsion tube into the center bearing bracket 

and slide the other end of the tube into the 

opposite end bearing bracket. Position the 

torsion tube so that equal amounts of the 

tube extend from each end bearing bracket.

LEFT hAND 

CABLE DRUM 

RED

RIG

hT 

hAND 

WOUND 

RED 

WINDING 

CONE 

LEFT 

hAND 

SIDE

RIGhT hAND CABLE 

DRUM BLACK

TORSION 

TUBE

LEFT

 hAND 

WOUND 

BLACK

 

WINDING 

CONE 

RIG

hT 

hAND 

SIDE

NYLON CENTER 

BRACKET BUShING

LEFT hAND CABLE 

DRUM RED

RIGhT hAND WOUND

RED WINDING CONE

LEFT hAND SIDE

NYLON CENTER 

BRACKET BUShING

RIGhT 

hAND 

CABLE 

DRUM 

BLACK

TORSION 

TUBE

LEFT hAND WOUND

BLACK WINDING CONE 

RIGhT hAND SIDE

TORSION 

ASSEMBLY

CENTER 

BRACKET

EqUAL 

SPACING

END 

BEARING 

BRACKET

TORSION 

ASSEMBLY

Summary of Contents for 8800 Aluminum Full View

Page 1: ...about any of the procedures do not perform the work Instead have a qualified door agency do the installation or repairs 2009 Wayne Dalton Corp Part No 338303 REV1 08 03 2009 Torsion Spring Installation Instructions and Owner s Manual Portland Source Plant Wayne Dalton Corp P O Box 67 Mt Hope OH 44660 www wayne dalton com ...

Page 2: ...tion to any part of the door especially to springs spring brackets bottom corner brackets red colored fasteners cables or supports To avoid possible severe or fatal injury have any such work performed by a trained door systems technician using proper tools and instructions 12 On electrically operated doors pull down ropes must be removed and locks must be removed or made inoperative in the open un...

Page 3: ...t bottom brackets As required 6 screw eye and pull rope as required LIFT HANDLEs as required jamb brackets as required mANUAL 8800 8850 Aluminum Full View IMPORTANT NOTICE Read these instructions carefully before attempting installation If in question about any of the procedures do not perform the work Instead have a qualified door agency do the installation or repairs Copyright 2008 Wayne Dalton ...

Page 4: ...ad bolts 5 16 X 2 HEX head LAG screws as required The bottom section can be identified by the factory attached bottom astragal or by the bottom bracket warning labels on each end stile This section is always the 1st section on four and five section doors The lock section may have a yellow and black warning label on the right side of the section This section is always the 2nd section on four and fi...

Page 5: ...grips Step Ladder Tape Measure level vice clamps pencil 9 32 1 2 3 16 1 8 drill bits Counterbalance spring tension must always be released before any attempt is made to start removing an existing door A POWERFUL SPRING RELEASING ITS ENERGY SUDDENLY CAN CAUSE SEVERE OR FATAL INJURY TO AVOID INJURY HAVE A TRAINED DOOR SYSTEMS TECHNICIAN USING PROPER TOOLS AND INSTRUCTIONS RELEASE THE SPRING TENSION ...

Page 6: ...ng surface Any wood found not to be sound must be replaced For Torsion spring applications a suitable mounting surface must be firmly attached to the wall above the header at the center of the opening The mounting surface must be 2 x 6 lumber minimum Select southern yellow pine lumber Do not use lumber marked as spruce pine fur or SPF The mounting surface must be securely attached to the wall with...

Page 7: ...checking the opening It must be the same size as the door Vertical jambs must be plumb and level with header Important STAINLESS STEEL OR PT 2000 COATED LAG SCREWS NOT SUPPLIED MUST be USED When INSTALLING CENTER bearing brackets END brackets jamb brackets OPERATOR MOUNTING SUPPORT brackets AND DISCONNECT brackets ON TREATED Lumber PRESERVATIVE TREATED STAINLESS STEEL OR PT 2000 COATED LAG SCREWS ...

Page 8: ...ep Vertical track must be cut to the proper length prior to installation IMPORTANT Doors that are 7 0 or 8 0 in height do not require cutting the vertical track Determine the radius of your horizontal track NOTE All Portland tracks have the radius stamped on the side of the track Using this measurement refer to the vertical track cutting chart to determine the length of the vertical track Cut the ...

Page 9: ...jamb bracket with the slot above the quick install features in the vertical track The long side of the bracket is placed against the track Fasten the jamb bracket finger tight using 1 1 4 20 x 5 8 carriage bolt and 1 1 4 20 flange hex nut To attach the top jamb bracket JB 3 locate the third set of quick install features of the vertical track Align the slot in the jamb bracket with the slot above t...

Page 10: ...tom Bracket 5 IMPORTANT RIGHT AND LEFT HAND IS ALWAYS DETERMINED FROM INSIDE THE GARAGE LOOKING OUT NOTE for door section identification see page 4 Bottom brackets are right and left hand Locate the bottom section place the left hand bottom bracket flush against the bottom left hand corner Secure the bottom bracket to the sec tion using 1 1 4 x 5 8 tamper resistant self drilling screw and 2 1 4 x ...

Page 11: ...1 4 x 5 8 Carriage Bolts and 2 1 4 Flanged Hex Nuts Repeat for each of the pre drilled locations along the reinforcing fin Center Hinges Place 1 1 end hinge at each of the center stiles Vertically align the slot hole of the lower numbered leaf with the small groove in the center stiles and the center of the hinge with the top edge of the section Secure the center hinges to the section using 2 1 4 ...

Page 12: ...cket base top section top bracket assembly 1 3 8 16 hex nut 1 3 8 16 x 3 4 Hex head bolt top bracket slide 9 Lift Handle Bottom section Locate the center most stile of the bottom section of the door On the inside of the door center the lift handle vertically with the center stile horizontally on the bottom section rail and within 8 of the bottom of the section Using the lift handle as a template p...

Page 13: ...ill 7 16 Socket Driver Tape Measure Level Step Ladder BOTTOM SECTION 5 16 x 2 LAG SCREWS fLAGANGLE VERTICAL TRACK ASSEMBLY JAMB BRACKET vertical track roller jamb bracket 5 16 x 2 lag bolt IMPORTANT The tops of the vertical tracks must be level from side to side If the bottom section was shimmed to level it The vertical track on the shimmed side must be raised the height of the shim Position the l...

Page 14: ... remaining section s except top section in same manner Now flip up hinge leaf hold tight against section and fasten center hinges first and end hinges last using 2 1 4 x 7 8 self drilling screws Repeat for other section s except top section IMPORTANT Push hold the hinge leaf against section while securing with 1 4 x 5 8 self tapping screws NOTE Install lock at this time sold separately see instruc...

Page 15: ... 7 When installing a door with a torsion counterbalance system vertical track alignment is critical Position flagangle between 1 11 16 43 mm to 1 3 4 44 mm from the edge of the door Tighten the bottom lag screw Flagangles must be parallel to the door sections Repeat for opposite side IMPORTANT THE DIMENSION BETWEEN THE FLAGANGLES MUST BE DOOR WIDTH PLUS 3 3 8 86MM TO 3 1 2 89 MM FOR SMOOTH SAFE DO...

Page 16: ...NOT RAISE DOOR UNTIL HORIZONTAL TRACKS ARE SE CURED AT REAR AS OUTLINED IN STEP 23 OR DOOR COULD FALL FROM OVERHEAD POSI TION CAUSING SEVERE OR FATAL INJURY Tools Needed 15 14 With tracks installed you can adjust the top brackets Vertically align the top section of the door with the lower sections Once aligned position the roller in the top bracket slide out against the horizontal track Maintainin...

Page 17: ...Bit Step Ladder Measure to locate the center of the door and mark a vertical pencil line on the mounting surface above the door to indicate the center line of the door Then measure from the center of the bearing in one of the end bearing brackets DOWN to the top of the door Using that dimension measure UP from the top of the door and mark a horizontal pencil line on the mounting surface intersecti...

Page 18: ...orsion counterbalance winding cones and cable drums are now colored red DO NOT identify right and left hand by the set screw color Slide the nylon center bushing onto the torsion tube followed by the springs and cable drums The nylon center bushing springs and cable drums must be positioned as shown With assistance pick up the torsion assembly and slide one end of the tube through one end bearing ...

Page 19: ...cure the spring s to the center bearing bracket with 2 3 8 16 x 1 1 2 hex head bolts and 2 3 8 16 hex nuts IMPORTANT Springs under tension can be dangerous IMPORTANT The spring warning tag s supplied must be securely attached to the stationary spring cone in plain view Should a replacement spring warning tag be required contact Wayne Dalton Corp for free replacements Nylon Center Bushing Torsion S...

Page 20: ...ube and brace vice grips against jamb to keep cable taut Slide the right hand cable drum against the right hand end bearing bracket and rotate drum until cable is taunt Tighten set screws in right hand cable drum to 14 15 ft lbs of torque Once set screws contact the tube tighten screws one full turn IMPORTANT Check each cable making sure both are seated properly on the cable drums and have equal c...

Page 21: ...ng bars into the holes of the spring s winding cone rotate the winding cone upward toward ceiling 1 4 turn at a time until the required number of complete turns for your door height is achieved As the last 1 4 turn is achieved securely hold winding bar while tightening both set screws in winding cone to 14 15 ft lbs of torque Once set screws contact the tube tighten screws one full turn Carefully ...

Page 22: ... may not be supplied fabricate rear support for horizontal tracks Attach horizontal tracks to the rear supports with 5 16 18 x 1 1 4 hex bolts and nuts may not be supplied Horizontal tracks must be level and parallel with door NOTE If rear supports are to be installed over drywall use 5 16 x 2 hex head lag screws and make sure lag screws engaged solid structural lumber NOTE If an idrive opener wil...

Page 23: ...still does not operate easily lower the door into the closed position UNWIND THE SPRING S FULLY Refer to P1 on page 5 Removing an old door and recheck the following items 1 Check the door for level 2 Check the torsion tube for level 3 Check the track spacing 4 Check the counterbalance cables for equal tension 5 Check the track for potential obstruction of the rollers 6 Clamp locking pliers onto tr...

Page 24: ...ock assembly with the door section and align with the square hole in the vertical track The side lock should be spaced in approximately 1 8 from the section edge IMPORTANT side locks must be removed or made inoperative in the unlocked position if an operator is installed on the door NOTE After completing this step continue with step 12 on page 14 1 8 DO NOT INSTALL PULL ROPES ON DOORS WITH ELECTRI...

Page 25: ...RIC EYE SYSTEM THEN THIS MUST BE TESTED AT THE SAME TIME TO ENSURE THAT DOOR DOES NOT CLOSE AND A CLOSING DOOR OPENS IF PHOTOELECTRIC EYE SYSTEM IS OBSTRUCTED FAILURE TO MAKE ADJUSTMENTS IF NECESSARY CAN RESULT IN SEVERE OR FATAL INJURY 1 Install operator rail 1 2 to 1 1 2 13 38 mm above high arc of top section of the door 2 Mount operator to ceiling so that 1 to 1 1 2 25 38 mm clearance is mainta...

Page 26: ...ing solution is recommended A mild detergent solution consisting of one cup detergent with less than 0 5 phosphate dissolved into five gallons of warm water will aid in the removal of most dirt NOTE The use of detergents containing greater than 0 5 phosphate is not recommended for use in general cleaning of garage doors NOTE Be sure to clean behind weather stripping on both sides and top of door C...

Page 27: ...limitations may not apply to you Any claim under this Limited Warranty must be made in writing within the applicable warranty period to the dealer from which the product was purchased Unless the dealer is no longer in business a written claim to the Manufacturer will be the same as if no claim had been made at all At the Manufacturer s option pursuant to the dealer having notified the Manufacturer...

Page 28: ...86 7 036 548 7 059 380 7 121 317 7 128 123 7 134 471 7 134 472 7 219 392 7 254 868 Canadian 2 384 936 2 477 445 2 495 175 2 507 590 2 530 701 2 530 74 2 2 532 824 Other US and Foreign Patents pending Contact your local Wayne Dalton dealer To find your local Wayne Dalton dealer refer to your local yellow pages business listings or go to the Find a Dealer section online at www wayne dalton com Thank...

Reviews: