2020-12-V1.3
28
● Connect the network to an RS485 port of the Box
To configure each one of the equipment
● Configure the address of the 1st Modbus slave to 1, the 2nd to 2, the 3rd to 3 and
so on.
● Caution: A network must not contain multiple slaves with the same address.
● Write down the network to which the equipment is connected as well as its address,
brand, and model of the equipment and any identifying information. This information
will be necessary for the installation configuration and to retrieve data.
Summary of Contents for BOX
Page 1: ...BOX InstallationGuide UniversalBuilding Connector 2020 12 V1 3 Made in France...
Page 15: ...2020 12 V1 3 14 Connect the other end of the cable to the IP 852 server on the LON network...
Page 26: ...2020 12 V1 3 25...
Page 28: ...2020 12 V1 3 27 Serial wire the network or each of the 2 networks...
Page 37: ...2020 12 V1 3 36 Connect the other end of the cable to the IP 852 server of the LON network...