![Watts ZRO-PURE Installation, Operation And Maintenance Manual Download Page 10](http://html1.mh-extra.com/html/watts/zro-pure/zro-pure_installation-operation-and-maintenance-manual_4038369010.webp)
Page 10
Blue Tube Connection (From The ESOV To TANK)
Position tank in desired location, stand it upright or lay it on its
side (using the black plastic stand included). Insert the blue 1/4”
tube from the ESOV into the quick connect fitting on the tank ball
valve. Make sure the tube is pushed in all the way to the tube
stop (see page 9 for quick connect fitting use directions).
Step 20
Note:
Set the blue ball valve knob in-line with the blue tube, this is the “open” position.
Teflon tape must be applied in a clockwise direction. Wrap
(7 to 12 turns) around the male pipe threads (MPT) on the
stainless steel fitting on top of the tank.
Tank Ball Valve Installation
Thread the quick connect ball valve (supplied in the parts bag)
onto the stainless steel connector on the tank.
Note:
Do not over-tighten plastic connections.
Step 18
Step 19