background image

4

W-525 and W-525-NF Filtration Process

Specifications: 

1st stage:   

Sediment filter, 5 micron, 10" 

2nd stage:    Carbon Block filter, 5 micron, 10" 
3rd stage:   

Carbon Block filter, 5 micron, 10" 

4th stage:   

TFC membrane, 50GPD @ 60 PSI  

5th stage:   

Inline carbon filter 

Auto shut off valve 
Operating pressure:     

40-100 PSI 

Operating temperature:    40-100°F  

Please contact your local dealer at:  

Replacement Parts

 WATTS ITEM#

 DESCRIPTIONS

 SERVICE LIFE

 FPMB5-978

 Sediment filter, 5 micron, 10"

 6-12 months

 F109009

 Carbon block filter, 5 micron, 10"

 6-12 months

 F109009

 Carbon block filter, 5 micron, 10"

 6-12 months

 W-1812-50

 TFC membrane, 50GPD @ 60PSI

 24-36 months

 FI-CBA010J.38

 Inline carbon filter

 12-18 months

Summary of Contents for W-415-NF

Page 1: ...unsafe or of unknown quality without adequate disinfection before or after the system WARNING If you are unsure about installing your WATTS water filter contact a WATTS representative or consult a pr...

Page 2: ...rain saddle clamp 3 8 feed water valve faucet assembly 4 Manual Recommended Tools Lists Variable speed drill 1 8 and 1 4 drill bits 7 16 drill bit 1 2 and 9 16 open end wrenches or adjustable Phillips...

Page 3: ...on filter Auto shut off valve Operating pressure 40 100 PSI Operating temperature 40 100 F Please contact your local dealer at Replacement Parts WATTS ITEM DESCRIPTIONS SERVICE LIFE FPMB5 978 Sediment...

Page 4: ...bon filter Auto shut off valve Operating pressure 40 100 PSI Operating temperature 40 100 F Please contact your local dealer at Replacement Parts WATTS ITEM DESCRIPTIONS SERVICE LIFE FPMB5 978 Sedimen...

Page 5: ...age TFC membrane 50GPD 60 PSI 5th stage Inline carbon filter Auto shut off valve Operating pressure 40 100 PSI Operating temperature 40 100 F WATTS ITEM DESCRIPTIONS SERVICE LIFE FPMB5 978 Sediment fi...

Page 6: ...sition while the o ring provides a permanent leak proof seal 4 PULL TO CHECK SECURE Pull on the tube to check that it is secure It is a good practice to test the system prior to leaving site and or be...

Page 7: ...keep the drill bit cool If drill bit gets hot it may cause the porcelain to crack or chip 3 Using a 1 hole saw proceed to drill the large hole Keep drill speed on the slowest speed and use lubricating...

Page 8: ...to the 3 8 quick connect elbow on the polishing filter With Non Air Gap faucets this will be the only tube connected to the RO faucet Air Gap Faucet Follow the drinking feed tube connection instruc ti...

Page 9: ...n saddle near a garbage disposal may cause the drain line to plug 1 Gather the pieces of the drain saddle 1 Black compression nut 1 Semicircle bracket with opening 2 Screws 1 Foam gasket 2 Nuts for sc...

Page 10: ...all valve off TOP VIEW OF TANK BALL VALVE PPSV501222W OFF POSITION ON POSITION STEP 4 Mounting the Drain Clamp The drain saddle and part number to SC500B14 will fit most stan dard drain pipe It should...

Page 11: ...e local water temperature and water pressure NOTE During the fill period you may hear water trickling due to the Reverse Osmosis Process 4 After the Tank has filled open the RO Faucet to flush the tan...

Page 12: ...ty b Fill the tank sanitizer feeder with the recommended disinfectant dosage and connect the feeder to the water supply and RO storage tank c Turn on water supply and force water and disinfectant solu...

Page 13: ...pen the housing you may try unplugging the fitting between red tubing and the system in order to reduce the air and water pressure inside the housing 3 Filter and membrane change procedures a Shut off...

Page 14: ...te conversion of trivalent arsenic to pentavalent arsenic Please see the Arsenic Facts section of the Performance Data Sheet for further information Depending on water chemistry water temperature and...

Page 15: ...s of arsenic are potentially hazardous to your health trivalent arsenic is considered more harmful than pentavalent arsenic RO systems are very effective at removing pentavalent arsenic A free chlorin...

Page 16: ...in storage tank is low Normally it takes 2 3 hours to fill tank Low water pressure and or temperatures can reduce production rate Add pressure to storage tank The pressure should be 8 10 psi when the...

Page 17: ...m 4 The pH of the water must not be lower than 2 or higher than 11 5 The incoming water pressure must be between 40 and 100 pounds per square inch 6 Incoming water to the RO cannot exceed 105 degrees...

Page 18: ...18...

Page 19: ...19...

Page 20: ...stated in such warranties are exclusive and are the only remedies for breach of warranty EXCEPT FOR THE APPLICABLE PRODUCT WARRANTY IF ANY WATTS MAKES NO OTHER WARRANTIES EXPRESS OR IMPLIED TO THE FU...

Reviews: