![background image](http://html1.mh-extra.com/html/watts/sentinel-leak-defense-lds-3-075/sentinel-leak-defense-lds-3-075_installation-operation-and-maintenance-manual_4002646008.webp)
8
IOM-S-Leak Defense 2211
2022-03-15
© 2022 Sentinel Hydrosolutions, LLC
a. Locate an available 120 VAC outlet close to the valve
into which the transformer can be plugged.
Make sure this outlet is not connected to an on/off
switch or a GFI.
b. The 120 VAC outlet should not be more than 100 feet
from the valve. If a longer power wire is needed, it is
recommended that a new 120 VAC outlet be installed
closer to the valve.
a. The control panel should be located inside near the
most frequently used door of the home or in an easily
accessible area.
b. Once a location is chosen, make sure there is an outlet
within 6’ to provide power to the wireless panel with the
provided 12VDC power supply.
c. The wireless control panel should be located no farther
than 100 feet from the Leak Defense System valve.
50’ or less is recommended for reliable connection.
d. The standard power supply cable length is 6’. For con-
cealing the low voltage cable behind drywall, a hardwire
connection with additional cable length is available upon
request.
STEP 4: Locate an electrical outlet for the valve
STEP 5: Determine wireless control panel location
POWER & PANEL LOCATION
Critical:
The outlet must be located in a dry location.
Note:
Please install control panel at least 8 inches (20
centimeters) from a common use area, per FCC/IC
regulations.
LDS Panel
POLD Panel
(Non-LDS)