CO-190-PR/CO-1190-PR
1. Leader Pipe
Leader pipe should be cut so that the height of the finished cleanout is at or just
below the height of the finished floor. The leader pipe should be cut evenly with no
burrs or debris attached.
8"
(203)
Strainer Size
Chart A
Min./Max.
Pre-Pour
3/4"
(19)
4 7/16"
(113)
Pipe Size
8"
(203)
Pipe Size
4 7/16"
(113)
Chart A
Min./Max.
Pre-Pour
Strainer Size
3/4"
(19)
0-1" Adj.
Post-Pour
2 13/64"
(56)
0-1" Adj.
Post-Pour
2 13/64"
(56)
8"
(203)
Strainer Size
3/4"
(19)
4 1/4"
(108)
Chart A
Min./Max.
Pre-Pour
Pipe Size
8"
(203)
Pipe Size
4 1/4"
(108)
Chart A
Min./Max.
Pre-Pour
Strainer Size
3/4"
(19)
CO-190-PR-60 & CO-1190-PR-60
0-1" Adj.
Post-Pour
2 1/8"
(55)
0-1" Adj.
Post-Pour
2 1/8"
(55)
3
Leader Pipe
Cleanout Body
Cleanout Body
Leader Pipe