background image

Setting the Altitude Controls

STEP 1

Pre-set pilots as noted:

Altitude Control

 – Adjust OUT, counterclockwise, backing pressure off the spring. This simulates a low tank setting which can be 

gradually increased to the desired setting.

Opening and Closing Speed

 – Turn the adjustment screws on the Closing Speed and Opening Speed Controls, if the main valve is 

so equipped, OUT, counterclockwise, 1

½ 

to 2

½ 

turns from full closed position.

STEP 2

Energize the solenoid to check actuation and to confirm connection 
to power source and so that initial valve filling is against the closed 
solenoid.

NOTE:

 

In cases when testing is required prior to electrical 

installation the solenoid can be manually engaged using the manual 
override red knob on the end of the solenoid.

STEP 3

To ensure proper operation, any trapped air will need to be bled off 
the valve cover during startup. The ACV includes a bleed valve, use 
a flat head screwdriver to slowly open the valve (See Figure 1).

STEP 4

Pressure the line, by opening the upstream isolation valve slowly. Air 
is vented through the air bleed valve. Tighten the fitting when liquid 
begins to vent (See Figure 1).

Repeat the process until no air is trapped in the system.

STEP 5

Switch the solenoid to the open position (de-energize solenoid).

Globe

Angle

Size (in)

1

 

1/4

1

 

1/2

2

21/2

3

4

6

8

10

12

14

16

20

24

A (in)

16

16

20

22

22

24

32

34

38

44

48

52

56

56

B (in)

10

10

12

14

14

16

24

26

28

30

34

40

48

48

Size (in)

1

 

1/4

1

 

1/2

2

2

 

1/2

3

4

6

8

10

12

14

16

C (in)

16

16

20

22

22

24

32

34

38

44

48

52

D (in)

10

10

12

14

14

16

24

26

28

30

34

40

The following tables detail the recommended minimum valve servicing dimensions.

          

B

          

          

FLOW

FLOW

FLOW

          

FLOW

Valve Servicing Dimensions

Counterclockwise to OPEN 

bleed valve

Figure 1 

Position Indicator

IOM-A-ACV-960-15-17_660-15-17   2115 

EDP# 1917064 

© 2021 Watts         3

Summary of Contents for AMES 660GD-15-17

Page 1: ...ting the Altitude Controls 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the inform...

Page 2: ...oper procedures be followed Time must be allowed for the valve to react to adjustments and the system to stabilize The objective is to bring the valve into service in a controlled manner to protect th...

Page 3: ...will need to be bled off the valve cover during startup The ACV includes a bleed valve use a flat head screwdriver to slowly open the valve See Figure 1 STEP 4 Pressure the line by opening the upstre...

Page 4: ...downstream isolation valve STEP 7 If the valve remains closed as indicated by the stem position in the position indicator See Figure 2 and the tank level is known to be below the desired level SLOWLY...

Page 5: ...be turned OUT counter clockwise an additional to turn This will lower the shut off level slightly below the tank over flow mark eliminating any wave action discharge from the over flow pipe See Figure...

Page 6: ...cification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm or...

Page 7: ...valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blockage...

Page 8: ...e cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require the...

Page 9: ...h or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are threaded...

Page 10: ...in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity o...

Page 11: ...Steel 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile...

Page 12: ...sulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no control...

Reviews: