SmartPlate EV Installation, Operation and Maintenance Manual
CHAPTER 2
– INSTALLATION
OMM-0147_C
• SP-102 • 3/2/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
19
of
72
MODBUS WIRING CONNECTIONS Instructions
Figure 2.6.1. Eurotherm 3504 Temperature Controller Terminal Connection Diagram
2.7 PRESSURE RELIEF INSTALLATION
SmartPlate EV units are shipped with the Pressure Relief Valve assembled.
Pressure Relief Valve and Air Bleeder Valve Installation Instructions
1. Attach a drain pipe to the end of the Pressure Relief Valve and run it to any convenient
drain.
Figure 2.7-1. Pressure Relief Valve Installation
PRESSURE
RELIEF VALVE
ELBOW
NIPPLE