Modulex EXT Commercial Series
CHAPTER 4: Installation Instructions
OMM-0160_A
• DRAFT Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
32
of
117
Figure 4-6: BMM Location and Flow Switch Connection
4.13 Determination Of Primary Boiler Pump or Boiler System Pump
The following
table gives an indication of the pump’s flow rate in function of the
∆t
of the primary
circuit if the installation has a mixing header.
The size of the pumps must be determined by installers or technical engineers according to boiler data
and system design.
Summary of Contents for AERCO MLX EXT 1500 2S
Page 72: ......