APPENDIX G
G-1
5)
THIS IS A TYPICAL INSTALLATION DRAWING
.
LOCAL CODES AND AUTHORITIES SHOULD BE CONSULTED
.
2)
SHELL DRAIN VALVE AND CONDENSATE DRAIN TRAP SHOULD BE ARRANGED TO PERMIT THE FLUIDS TO DRAIN
HEIGHT
18
'' ABOVE FLOOR
.
4)
LOCATE WATER INLET AND OUTLET FITTINGS
(i.
e.
UNIONS
, ELBOWS
, ETC
.)
A MINIMUM OF
6''
FROM BOILER
ELECTRIC CONNECTIONS
(SERVICE SWITCHES
, CONDUIT BOXES
) SHOULD LIKEWISE
1)
FOR ACTUAL SIZES AND LOCATIONS OF PIPING AND OTHER CONNECTIONS TO THE BOILER
, SEE DIMENSIONAL DRAWING
(AP
-A
-739
).
3)
ALL
(*)
ITEMS ARE INCLUDED SEPARATELY IN SHIPMENT FROM FACTORY
.
BE
6''
AWAY FROM SIDE PANELS
.
NOTES
:
SINGLE UNIT INSTALLATION
GAS FIRED BOILER
BENCHMARK
2
MIL
. BTU LOW NOx
AIR SEPARATOR
AUTOMATIC AIR VENT
1-
1/
2"
NPT
DRAIN CONN
.
LINE SIZE BYPASS
BACKFLOW PREVENTER
DIAPHRAGM TYPE EXPANSION TANK
WATER
SUPPLY
* CONDENSATE
DRAIN TRAP
P&
T
RELIEF VALVE
(TYP
.)
PRESSURE REDUCING FILL VALVE
HEATING SYSTEM RETURN
CHECK VALVE (TYP
.)
HEATING SYSTEM SUPPLY
SYSTEM PUMP
AT MAXIMUM BTU
/HR INPUT
,
MAINTAIN MINIMUM GAS PRESSURE AT 5.
3"
W
.C
.(FM GAS TRAIN
);
5.
5"
W
.C
. (
IRI
).
MAX
. GAS PRESSURE
=
2.
0
PSIG
. (
SEE NOTE
6)
* 2
" MANUAL
SHUTOFF VALVE
DIRT TRAP
GAS SUPPLY
FREELY
, BY GRAVITY
, TO A CONVENIENT FLOOR DRAIN
.
RELIEF VALVE SHOULD BE PIPED VERTICALLY TO A
FITTINGS TO PREVENT INTERFERENCE WITH REMOVAL OF BOILER PANELS AND COVERS
.
ALL PIPING AND
NORTHVALE
, NJ
07647
INTERNATIONAL
, INC
.
APPD
.
DWN
.BY
SCALE
DATE
DATE
CZ
NTS
021506
AERCO
SD
-A
-671
TEMPERATURE GAUGE
P&
T
PRESSURE
&
BALANCING VALVE
ISOLATION VALVE UNION
Y STRAINER
LEGEND
6)
WHEN AVAILABLE GAS PRESSURE IS GREATER THAN
2.
0
PSIG
, A LOCK
-UP STYLE REGULATOR MUST BE INSTALLED
DOWNSTREAM OF THE
2"
MANUAL SHUTOFF VALVE TO BRING THE GAS PRESSURE DOWN TO
2.
0
PSIG
.
REV
A
Summary of Contents for AERCO Benchmark 2.0LN
Page 9: ... This page intentionally blank ...
Page 19: ... This page intentionally blank ...
Page 29: ... This page intentionally blank ...
Page 35: ... This page intentionally blank ...
Page 41: ...5 1 This page intentionally blank ...
Page 47: ...SAFETY DEVICE TESTING 6 1 This page intentionally blank ...
Page 70: ...APPENDIX C C 1 Temperature Sensor Resistance Chart Balco ...
Page 77: ...APPENDIX F F 2 ...
Page 78: ...APPENDIX F F 3 ...
Page 79: ...APPENDIX F F 4 ...
Page 92: ...APPENDIX G G 5 ...