Basic Installation Instructions
Series 909

Sizes: 2

1

2

" – 10" (65 – 250mm)

Installation

A. Series 909 should be installed in a horizontal and

upright position. This positions the relief valve below the
first check valve, enabling the zone to drain through the
relief valve outlet. The shutoff valve with the test cock is to
be mounted on the inlet side of the backflow preventer. The
test cock is on the inlet side of the shutoff valve.

B. The 909 should always be installed in an accessible location

to facilitate testing and servicing. Check the state and local
codes to insure that the backflow preventer is installed in
compliance, such as the proper height above the ground.

C. Water discharge from the relief valve should be vented in

accordance with code requirements. The relief valve should
never be solidly piped into a drainage ditch, sewer or sump.
The discharge should be funneled through a Watts air
gap fitting piped to a floor drain.

D. Watts recommends a strainer be installed ahead of Watts

909 Series assemblies to protect the discs from unnec-
essary fouling.

E. Backflow preventers should never be placed in pits unless

absolutely necessary and then only when and as approved
by local codes. Consult your local or state plumbing or
health inspector. Watts recommends installation indoors or
above ground in an insulated enclosure.

Start Up

F. The downstream shutoff should be closed. Open upstream

slowly, fill the valve and bleed the air through Test cock 2, 3
and 4. When valve is filled, open the downstream shutoff
slowly and fill the water supply system. This is necessary to
avoid water hammer or shock damage.

G. The installation of a Watts air gap with the drain line termi-

nating above a floor drain will handle any normal discharge
or nuisance spitting through the relief valve. However, floor
drain size may need to be designed to prevent water dam-
age caused by a catastrophic failure condition. Do not
reduce the size of the drain line from the air gap fitting.

H. Two or more smaller size valves can be piped in parallel

(when approved) to serve a larger supply pipe main. This
type of installation is employed where increased capacity is
needed beyond that provided by a single valve and permits
testing or servicing of an individual valve without shutting
down the complete line.

The number of assemblies used in parallel should be deter-
mined by the engineer's judgement based on the operating
conditions of a specific installation.

Indoors

Above Ground

Parallel

TABLE ONE - CAPACITY REQUIRED FOR SYSTEM

50 gpm

100 gpm

150 gpm

200 gpm

250 gpm

350 gpm

450 gpm

640 gpm

1000 gpm

2000 gpm

3000 gpm

5000 gpm

Two 

3

4

"

Two 1"

Two 1

1

4

"

Two 1

1

2

"

Two 1

1

2

"

Two 2"

Two 2

1

2

"

Two 3"

Two 4"

Two 6"

Two 8"

Two 10"

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Devices

Table shows total capacity provided with dual valve installations of various sizes.

Now available, WattsBox Insulated Enclosures, for more information,

send for ES-WB.

Watts 909S

2

1

2

" - 10"

(65 - 250mm)

Meter

Strainer

Main

Air

Gap

12" (300mm)

Min. 12" (300mm)

Watts 909

2

1

2

" – 10"

(65 – 250mm)

Strainer

Air Gap

3

support

Summary of Contents for 909Series

Page 1: ...TO THE PRODUCT THE COMPANY MAKES NO OTHER WARRANTIES EXPRESS OR IMPLIED THE COMPANY HEREBY SPECIFICALLY DISCLAIMS ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRA...

Page 2: ...t the safe drinking water as per applicable standard Figure 1 Series 909 RELIEF VALVE DISCHARGE RATES ZONE PRESSURE PSIG FLOW RATE GPM Installation Note The flange gasket bolts for the gate valves sho...

Page 3: ...Test cock 2 3 and 4 When valve is filled open the downstream shutoff slowly and fill the water supply system This is necessary to avoid water hammer or shock damage G The installation of a Watts air...

Page 4: ...drips push the hold button for 2 seconds Record reading must be 2 psid or more Push Stop Test 8 Close VA and VB Test No 2 Test No 2 Check Valve 9 Install bypass hose between VA and TC 4 Open VA then...

Page 5: ...3 RK 909 S 8 200 0887734 RK 909 S 10 250 Kits include Seat Seat O ring Cover O ring Retainer wire and lubricant Total Rubber Parts Kits 0887750 RK 909 RT 21 2 3 65 80 0887751 RK 909 RT 4 100 0887752 R...

Page 6: ...Bottom plug o ring and lubricant Relief Valve Total 0887235 RK 909 VT 21 2 3 65 80 0887236 RK 909 VT 4 6 100 150 0887237 RK 909 VT 8 10 200 250 0887238 RK 909M1 VT 4 10 100 250 Kits include Adapter o...