Basic Installation Instructions

Installation Note:

The flange gasket bolts for the
gate valves should be retight-
ened during installation as the
bolts may have loosened due to
storage and shipping.

Check with local authorities for installation requirements. If
installing on a fire protection system be sure to purge air
from the system. Fill system slowly with all inspector test
valves open.
Pipe lines should be thoroughly flushed to remove foreign
material before installing the unit. A strainer should be in-
stalled as shown, ahead of the backflow preventer to prevent
discs from unnecessary fouling.

CAUTION: Do not install a strainer when backflow preventer
is used on seldom-used water lines which are called upon
during emergencies, such as fire sprinkler lines, etc.
It is important that Series 775 be tested periodically in compli-
ance with local codes, but at least once a year or more often,
depending upon system conditions.

775 Series for Retrofit Installations

Watts 775

12” min.
Refer to
Local Codes

Vault Installation

Vertical Flow
Up

12” min.
Refer to
Local Codes

Watts 775

Watts Series 775 Double Check Valve

#2 Test Cock

#3 Test Cock

#4 Test Cock

Outlet

Shutoff

Valve

Second Check

First
Check

#1 Test Cock

Inlet
Shutoff
Valve

Summary of Contents for 775 Series

Page 1: ...misapplication or improper installation of the product THE COMPANY MAKES NO OTHER WARRANTIES EXPRESS OR IMPLIED EXCEPT AS PROVIDED IN THIS LIMITED WARRANTY For field testing procedure send for IS TK...

Page 2: ...o remove foreign material before installing the unit A strainer should be in stalled as shown ahead of the backflow preventer to prevent discs from unnecessary fouling CAUTION Do not install a straine...

Page 3: ...Up D The downstream shutoff should be closed Open upstream slowly fill the valve and bleed the air through Test cock 2 3 and 4 When valve is filled open the downstream shutoff slowly and fill the wat...

Page 4: ...Check 6 and 8 models only Place yourself so that the water flow through the valve is left to right 1 Shut down water system and lock out system if possible Slowly open all ball valves to relieve air a...

Page 5: ...775DCDA RC1 3 4 3 4 775 775DCDA N775 N775DCDA 0888907 RK 775 775DCDA RC1 6 8 6 8 775 775DCDA N775 N775DCDA Kit includes First Check Assembly O ring and Check Disc Second Check Rubber Parts Kit 088890...

Page 6: ...screwdriver lift the bar up so that the clapper is free to swing up wards away from the seat Figure 8 Using your free hand swing the clapper open until the roller is almost to the free end of the bar...

Page 7: ...urns to PSID No 2 shutoff valve is leaking excessively and must be replaced to test the valve 8 Close all test cocks remove hoses from TC 2 and TC 3 and TC 1 reopen shutoff valve 1 Proceed to Test No...