INSTALLATION INSTRUCTIONS
Boiling Billy JE, JR Series
DO NOT PLUG IN OR TURN ON
POWER
1.
Fit tap and shank on the outlet connection
provided.
2.
Mount unit on the wall using fixing points on
the back of the unit. It is advisable to
position the tap outlet over a drain board so
that in the event of a leaking tap the water
can be disposed via the sink.
3.
Connect cold water supply to the inlet
(12mm) through a stop tap in the supply
line. (stop tap to be provided by the
installer)(. We recommend the fitting of a
350kpa PLV.
4.
Connect overflow pipe to waste or any other
area where water can be disposed in a safe
manner.( Tundish should be fitted)
5.
* Plug unit into 10 amp power outlet.
6.
Turn ‘on’ water supply to the unit and ‘open’
the outlet tap.
7.
Wait until the water flows out of the tap.
8.
When the water flows out of the tap please
switch on the power.
*3.0kw element requires a 15amp power outlet.
INSTALLATION INSTRUCTIONS
JE SERIES