8.6 Installation and service checklist
The following work must be carried out under the maintenance rule:
Component?
Water Supply
To be checked
Supply secure at mains stop valve.
ok?
Secure at inlet valve
Water filter
New Water Filter fitted?
Water filter fitted securely without leaks?
Sanitation
All 3 water outlets disinfected with Anolyte or Sanitab?
Outlet dispense
Each of the 3 dispense option operates?
Cooling
Is the cooling system operational?
Does the cooling system fan operate?
Dispense area
Aerator disinfected or replaced as nesecary?
Dispense area cleaned and disinfected?
Drip tray
Drip tray emptied, cleaned and disinfected?
Overflow functionality of drip tray checked?
CO
2
connection
Pipe work checked for leaks?
CO
2
connection for -
Refillable system
Checked regulator pipe fitting for leaks?
Check fitting of regulator on the cylinder,
make sure cylinder is upright and secure.
Water and Electrical
Check all connections are secure
connections
Functional Test
Carry out a final test of each dispense
and check temperature.
The equipment has been cleaned and checked for all functions. The equipment is ready for use.
Date:
Technician:
23
Summary of Contents for escowa Purus iQ3
Page 1: ...Purus iQ3 Service Manual For the Installation Programming Cleaning and Maintenance...
Page 32: ...Notes 32...
Page 33: ...Notes 33...
Page 34: ...Notes 34...
Page 35: ...Notes 35...
Page 36: ...copyright engl version 2 09 12...