8.4
Polymerisation Operation
•
Fill the work device with mains water to above the white plastic ring in the container
(max. 21 litres).
•
Activate main switch (green rocker switch).
•
Check the water level – the low water alarm
must not flash.
•
Place prepared cuvettes in the device clamp.
•
The polymerization is started by touching the symbol or alternatively via the
parameter menu
•
fter the polymerations process has ended, the temperature falls/rises to the preset
temperature again. (see page 13).
21
A
6b
6a
7
Water level sensor
6b
A
6a
7
Summary of Contents for Wapo-Ex 8 plus
Page 1: ...Boil Out and Polymerisation Unit Wapo Ex 8 plus MANUAL ...
Page 28: ......