background image

 7.2 

Start-up

Define the unit's main parameters before switching it on. These settings are performed in 

the Set-Up Menu        . Familiarise yourself with the system's various options before 

starting the polymerisation process. This particularly applies to functions        and 

.

(Please see „setup menu page 1“ on page 11

 

of this manual).

The Start menu in Polymerisation mode

Name of the unit 

Actual-Temperatur 

Open Setup menu

Heater ON/OFF*

Pressure ON/OFF*   

Programme parameter and 

Polymerisation

*Inverted (background is black) = ON

The Start menu in Compactor mode (without heater)

10

1

3

2

4

5

6

3

7

14

Summary of Contents for Polyquick 160-T120

Page 1: ...Combination Automat Polyquick 160 T120 Pressure Polymerisation Unit and Compactor USER MANUAL...

Page 2: ...as well as the precautions given in this user manual We are not liable for any damages which occur due to inappropriate usage or faulty operation of this unit Make sure that anyone using this unit has...

Page 3: ...essure 9 7 2 Start up 10 8 Operation 17 8 1 General Operating Instructions 17 8 2 Operation 18 9 Troubleshooting 19 10 Care and Maintenance 21 10 1 Cleaning 21 10 2 Maintenance 21 10 3 Repairs 21 10 4...

Page 4: ...Exact remaining time displayed Powerful electronically controlled heating for optimal water temperature Pressure relief valve for protection in case of malfunction 7 bar Safety lid with bayonet lock D...

Page 5: ...pressure can be activated only if the door is closed completely since a safety door contact is installed Dry run protection which switches off at 125 C The integrated thermal fuse works automatically...

Page 6: ...sponsible for damage arising from the nonobservance of these instructions Warranty and responsibility provisions contained in the sales and supply conditions of Wassermann Dental Maschinen GmbH are no...

Page 7: ...a steady and even surface Install the unit in a place where it will not block the working area and the functionality take the dimensions into account Do not install the unit outdoors or in places with...

Page 8: ...t most up to the engraving in the tank Establish a pneumatic connection of minimum 2 bar If the pneumatic pipe is long pay attention to the hose cross section internal diameter min 6 mm Every pneumati...

Page 9: ...rn the pressure regulator on the back side in the minus direction several times then apply pressure to the tank You can set the desired pressure by turning the regulator in the plus direction Temperat...

Page 10: ...g the polymerisation process This particularly applies to functions and Please see setup menu page 1 on page 11 of this manual The Start menu in Polymerisation mode Name of the unit Actual Temperatur...

Page 11: ...ade Preheating temperature Clock timer Forward in menu Sleep Heater ON OFF back to Start menu Mode Polymerisation Compaction without heater Setup menu page 2 C F Date and Time Forward in menu Work mod...

Page 12: ...5 Description of features 5 14 Pressure ON OFF Bevore starting the programme you have to choose the pressure For further information please see 7 1 Setting the correct Pressure 12...

Page 13: ...r up to three polymerisation stages 1 3 can be mapped Touch the numbers to change the values Polymerisation level 1 1 Delete Next step Save Examples of level 2 and level 3 Start Touch the arrow Start...

Page 14: ...periods Default 60 C If the programme temperature selected is higher the temperature reverts back to this value when the programme ends After defining the desired working mode it may make sense to ad...

Page 15: ...ton the unit goes into the Sleep mode all functions except the Timer function are switched off The unit gets actuated when you press the touch display or with the timer and heats up or cools down to t...

Page 16: ...ation process should start immediately or only after the heating value has been reached a Default The unit heats to the temperature programmed under After reaching this value the result measured is va...

Page 17: ...n 8 1 General Operating Instructions All instructions for using the unit whether in verbal or written form are based on our own experience and experimentation and can only be regarded as guidelines Pl...

Page 18: ...d up to the stop Switch on the main switch the unit will automatically heat up to 60 C or up to the value selected as the pre heating temperature If warning appears close the lid Activate the pressure...

Page 19: ...ulty Let the unit cool down and try again Replace faulty fuse Please contact our service department Display blank Thermal fuse off or Thermal fuse faulty Let the unit cool down and try again Replace f...

Page 20: ...If the previous recommendations do not solve the problem contact your dental depot or our service department VIDEO CALIBRATION https t1p de TDRec 20 Fig 2 Fig 3 Fig 1...

Page 21: ...the pressure tank using a pair of blunt tweezers The ring groove for holding the gasket ring must always be kept clean Use Vaseline or oil while inserting the gasket ring back into the ring groove To...

Page 22: ...sk bracket support Flask basket Compressed air hose 2 m Discharge hose 2 m Hose clip 12 20 x 9 Thermal protection cover Spacer sleeve 4 pieces Screw 4 pieces Before start up screw it to the swivel doo...

Page 23: ...it has been fixed This warranty does not cover damage caused by improper use external mechanical causes transport damage or interference with the unit by unauthorized persons 11 Technical Data Polyqu...

Page 24: ...tect the environment prevent environmental pollution and improve the recycling of raw materials the European Commission adopted a directive that requires the manufacturer to accept the return of elect...

Page 25: ...ohne unsere Zustimmung ver ndert wird This is to confirm that the above mentioned machine complies with the described EU guidelines This declaration becomes invalid if the machine is modified without...

Page 26: ...Notes 26...

Page 27: ...27...

Page 28: ......

Reviews: