The fresh water cooling system is divided into a high temperature (HT) and a low temperature
(LT) circuit. The HT water circulates through cylinder jackets, cylinder heads and the 1st stage
of the charge air cooler, while the LT water circulates through the 2nd stage of the charge air
cooler and through the lubricating oil cooler.
A two-stage charge air cooler enables more efficient heat recovery and heating of cold
combustion air.
The LT water circulates through the charge air cooler and the lubricating oil cooler, which is
built on the engine.
Temperature control valves regulate the temperature of the water out from the engine, by
circulating some water back to the cooling water pump inlet. The HT-water pump is circulating
the cooling water in the circuit and a thermostatic valve controls the outlet temperature.
HT-thermostatic valve(s) can be mounted as option outside of the engine. The LT-water pump
is circulating the cooling water in the circuit and an LT-thermostatic valve mounted in the
external cooling water system, controls the inlet temperature for correct receiver temperature.
It is mandatory that the actuated type thermostatic valve is controlled by the automation
system.
9.2.1
Engine driven circulating pumps
The LT and HT cooling water pumps are engine driven. The engine driven pumps are located
at the free end of the engine.
Pump curves for engine driven pumps are shown in the diagrams. The nominal pressure and
capacity can be found in the chapter Technical data.
Wärtsilä 31 Product Guide - a1 - 18 October 2016
9-7
9. Cooling Water System
Wärtsilä 31 Product Guide
Summary of Contents for 31
Page 1: ...PRODUCT GUIDE W rtsil 31...
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 30: ...This page intentionally left blank...
Page 36: ...This page intentionally left blank...
Page 44: ...This page intentionally left blank...
Page 88: ...This page intentionally left blank...
Page 116: ...This page intentionally left blank...
Page 134: ...This page intentionally left blank...
Page 138: ...14 4 W rtsil 31 Product Guide a1 18 October 2016 W rtsil 31 Product Guide 14 Foundation...
Page 140: ...14 6 W rtsil 31 Product Guide a1 18 October 2016 W rtsil 31 Product Guide 14 Foundation...
Page 148: ...This page intentionally left blank...
Page 150: ...This page intentionally left blank...
Page 154: ...This page intentionally left blank...
Page 160: ...This page intentionally left blank...
Page 162: ...This page intentionally left blank...
Page 165: ......
Page 166: ......
Page 167: ......