Dry-Fit /  

Cutting & Turning 

1.  Verify that the cold lead wires at the end 

of each roll will reach the thermostat 

location. Run the cold lead wires no 

closer than 1” from the edge of the 

warming roll. Cold lead wires cannot 

cross over a warming cable or the 

sensor wire (if applicable). Please note 

thickness of the factory splice and cold 

lead and plan accordingly.

2.  Cut the fiberglass mesh backing as 

needed. Never cut the heating cables. 

Lay out the heating rolls on the floor for 

the final dry fitting review.

Install Warmlyyours 

Heating Rolls

1.  Use a staple gun, hot glue gun, or 

tape to secure the mat meshing to the 

subfloor every 6-8 inches. NEVER 

staple the wires, only the green mesh.

2.  If the system is controlled by a 

thermostat, choose a sensor location 

within 8 feet of the thermostat box 

and not in an area hit  by sunshine or 

in an uncommonly cold area. Place 

the sensor underneath the fiberglass 

backed mesh, and center it directly 

between the heating wires (See 

Diagram 1). It must project at least 6” 

into the heated area. The sensor wire 

must not cross heating wires, but may 

cross the cold leads if necessary.

3.  Run all cold lead wires beside the mats 

securing them to the subfloor with hot 

glue or tape every 8-10 inches in a 

flat path back to the control or junction 

box location. For even tiles , you may 

need to route into the subfloor or 

underlayment for clearance of the cold 

lead and splice.

4.  Perform 2ND ohm test. Connect circuit 

check (if purchased) to each heating roll. 

    Diagram 1

Tile Installation

One-step method:

1.

  

Apply 3/8” of latex-portland cement with 

a square notched trowel over the rolls, 

trowelling in the direction of the wires 

whenever possible. 

2.

  

Set tiles as recommended. TIP: Remove 

excess thin-set that may ooze up between 

the grout joints with a wet rag, toothbrush 

or sponge while installing the tile, in 

preparation for a clean grout installation. 

NEVER use a utility knife to remove cured 

thin-set from grout joints as this can easily 

damage the heating wires and void the 

warranty.

3.

  

Disconnect Circuit Check and Perform 

and record 3RD ohm test on Warranty 

Registration Card.

Two-step method:

1.

  

Apply a 1/8” skim coat with a flat rubber 

trowel using latex-portland cement or self-

leveling cement over the rolls and allow 

proper cure time as per manufacturer 

recommendation before moving to next 

step. 

2.

  

Apply a second ¼” layer of latex-portland 

cement using a square notched trowel and 

set tile as recommended.  TIP: Remove 

excess thin-set that may ooze up between 

the grout joints with a wet rag, toothbrush, 

or sponge while installing the tile, in 

preparation for a clean grout installation. 

NEVER use a utility knife to remove cured 

thin-set from grout joints as this can easily 

damage the heating wires and void the 

warranty.

3.

  

Disconnect Circuit Check and Perform 

and record 3RD ohm test on Warranty 

Registration Card.

Electrical Connections

1.  The electrical wiring should follow the 

wiring instructions provided with the 

thermostat. 

2.  The thermostat is mounted in a double-

gang wall box with a single-gang mud ring. 

3.  The heating mats must be connected to 

the electrical service via a GFCI (Ground 

Fault Circuit Interrupter). The GFCI feature 

is incorporated in the thermostat.

4.  All electrical connections should be 

performed by a licensed, certified 

electrician.

Allow proper thin-set and grout cure time as 

recommended by the manufacturer before 

powering-up the WarmlyYours electric 

radiant heat system.

 

Ceramic Tile & Natural Stone Floors - Cont.

STEP 1

STEP 2

STEP 3

STEP 4

11

Summary of Contents for TempZone

Page 1: ...1 1 Free Design Service 24 7 Installation Support No Nonsense Warranty 800 875 5285 www WarmlyYours com Installation Manual for your TempZone Electric Radiant Floor Heating System Twin Conductor...

Page 2: ...ted surface temperatures and lower energy usage The floor will have the capacity to warm to a comfortable temperature and in some cases can be employed as the primary heat source for that room Securin...

Page 3: ...Electrical Housing Boxes Switch Plates All control devices except a Relay Contactor fit into a double gang box If a double gang box is used it will need to be fitted with a single gang mud ring We str...

Page 4: ...to continue in a new direction See Page 5 for full details on how to execute turns F Free Form Space Indicates a length of Fiberglass Mesh that needs to be removed and separated from the Heating Eleme...

Page 5: ...re a Relay Contactor or Power Module s in addition to the control device to operate properly The Relay or the Power Modules may be located in the same vicinity as the control device If your system wil...

Page 6: ...is indicated on the Installation Plan by an arc with an arrowhead By examining the relationship between two panels you will determine the type of turn needed Free Form Free form spaces are filled with...

Page 7: ...Mesh sits on top of the Heating Element Working around Obstacles Special circumstances will require the Heating Element to circumvent an obstacle The released Heating Element is not needed to fill an...

Page 8: ...hold the wires onto the probes with your fingers A digital meter is easier to use and strongly recommended It is wise to verify that the batteries of the Ohmmeter are good Set your Ohmmeter to measur...

Page 9: ...lack Red Copper Ground Black Lead THERMOSTAT 1 2 3 4 5 C O INDIA Made by Thermopads Pvt Ltd for WarmlyYours com Inc ENREGISTRE LISTED C US RADIANT HEATING PANEL UNIT UNITE DE PLANCHER CHAUFFANT ELECTR...

Page 10: ...the Mudbed in the thin set used to adhere the tiles It is advised to prepare the subfloor as you would for any conventional installation along the Tile Council of America Guidelines Once installed ove...

Page 11: ...suitable glue or cement based adhesive or thinset mortar to adhere it to the slab If installing in a wet location ensure the slope of the mortar bed is maintained to direct water to the drain pipe Not...

Page 12: ...henever possible 2 Set tiles as recommended TIP Remove excess thin set that may ooze up between the grout joints with a wet rag toothbrush or sponge while installing the tile in preparation for a clea...

Page 13: ...n the UL label and on the installation plan The Ohms readings should be within a 15 variance of the Ohm value specified on the UL tag Measure the continuity between core wire and ground wire The readi...

Page 14: ...ply the Flooring Adhesive glue 1 Apply manufacturer s recommended adhesive as per flooring installation instructions Install Laminate Engineered Wood Flooring 1 Install laminate or engineered wood flo...

Page 15: ...anty cards Using a hot glue gun secure the cold lead to the mortar bed and over the shower curb In order to minimize tension on the cold lead use an S formation to bring the cold lead over the shower...

Page 16: ...Ohm resistance of each roll should be measured across the core wires Make sure the probes of the Ohm meter do not touch the sheath wire Make sure you do not touch either of the probe ends with your fi...

Page 17: ...If a sensor is used indicate its location on the plan The electrician should put the code labels UL from any Heating Roll used in a convenient place such as the circuit breaker box The labels should h...

Page 18: ...must be electrically grounded and protected by a GFI Ground Fault Interrupter 4 The installation must comply with all national and local electrical and building codes as well as any other applicable...

Page 19: ...INESS REPLY MAIL FIRST CLASS MAIL PERMIT NO 77 LONG GROVE IL WarmlyYours Inc 590 Telser Rd Ste B Lake Zurich IL 60047 NO POSTAGE NECESSARY IF MAILED IN THE UNITED STATES POSTAGE WILL BE PAID BY ADDRES...

Reviews: