20
20
20
20
19
19
31
30
31
30
18
13
18
ROOF ASSEMBLY
18) PLEASE NOTE: The Side (4x 20) and End (2x 19) Wall Caps are L-shaped in section; align the thin
edge on the inside so the larger edge rests on top of the wall assemblies and glue in place as shown.
Connect the Roof Halves (2x 18) by gluing Large Connecters (2x 13) on the underside of each half as
shown. Make sure the Roof is resting on the raised ridges on double wall panels and tops of Connectors
(13, 14): it may be glued or simply set in place if you wish to add floors, interior details or lighting (all sold
separately).
TRANSFORMER
CABINET
36
35
33
32
34
37
55
52
54
53
50
51
AC UNIT
16) Pad-Mounted Transformer Cabinet: Using raised ridges on Base (37) to align Walls (32, 33, 34
& 35), glue to Base and at inside corners where parts meet as shown. Align inset area on underside
of Top (36) with wall assembly and glue where parts meet.
17) Roof-Top AC Units - make 2 as shown: Note raised ridges on Front (53) and Side Walls (51,
52) are the bottom and rest on the Base (50). Align tabs and slots on Front and Side Walls, glue at
inside corners where parts meet and to Base. Glue Rear Wall (54) below angled ridges on both
sidewalls and to Base. Align inset area on underside of Top (55) with wall assembly and glue where
parts meet.
216
218
216
217
216
208
204
205
206
207
209
203
202
202
210
203
212
213
211
214
215
201
PARTICULATE DUST CYCLONE
19) PLEASE NOTE: As there no set mounting points, the
Access Ladder, Discharge Pipe and Inlet Pipe can be installed
at any location, a typical assembly is shown. Be sure inset
areas on back of Supports (2x 202) face inward and glue pins
on posts to openings in Base (201).
20) Align tabs on Cross Braces (2x 203) and glue to inset
areas on back of Supports.
21) Align pins and mounting points on back of Right (204) and
Left (205) Cyclone Halves and glue together. Glue mounting
pin on top of Discharge Flange (210) to opening on bottom of
Cyclone.
PLEASE NOTE: As the various details can be aligned as
desired, you may find it easier to set - do not glue - the Cyclone
in place on the supports so you can make adjustments as
needed during assembly.
Top Inlet
22) With the round ring of the Inlet Base (206) on the bottom
and the raised square facing up, align the Base in the desired
direction and glue to top of Cyclone. Compete assembly by
gluing Inlet Shroud (207) to Base as shown.
Bottom Discharge
23) Align Discharge Pipe (210) at 90° between Supports or Cross Braces as shown and glue
pin on bottom to opening in Discharge Flange.
Access Ladder
24) With safety tread detail facing upwards, align ridges on underside of Ladder Walkway (211)
with ridges on underside of Right (212) and Left (213) Handrail Supports and glue where parts
meet. Use the four mounting pins on the completed Supports to align this assembly inside the
vertical beam of a Cross Brace or Support – the ends of the Supports will rest on top of the
vertical beam – and glue where parts meet. Carefully remove Ladder (214) from the sprue
being careful not to damage the mounts. With the plain end (no rungs) facing upward as
shown, glue Ladder inside end of Walkway Support and to Base where parts meet. Carefully
remove the Ladder Cage (215) from the sprue to avoid damage. Align edge of Cage with
mounts on Ladder and glue where parts meet.
Inlet Pipe
25) PLEASE NOTE: As the Inlet Pipe can be assembled in various ways you may wish to refer
to the Roof Details step #43 for an another assembly option. While this sketch shows a single
inlet, four Inlet Flanges (#208) are provided so multiple inlets can be modeled, facing left or
right (right-hand shown) by simply turning them over. Determine the location of the flange/s and
glue in place towards the top of the Cyclone. Glue Connectors to pins on each end of Inlet Pipe
(217) as shown. Glue one end to pin on Flange as shown, and to 90° Elbow (218) at the other
end. Glue a Connector to the remaining end of the 90° Elbow. If you haven't already, glue
completed Cyclone to Supports.