Rev. 1.2
Assembly Instructions
– Dosing Valves WDV-0x
Page 14 of 34
Walther Systemtechnik GmbH
– D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de
7 Taking out of Service
7.1 Short Interruption
A short interruption (15 min or more) has to be followed by a fine dosing
IMPORTANT
Please follow the maintenance instructions!
7.2 Long-term Interruption
The following has to be observed for a long-term interruption of the device:
Make sure that system is depressurized (check all displays).
IMPORTANT
Please follow the maintenance instructions
!
7.3 Shutdown of Device
Please observe the following for a shutdown of the device:
Disconnect mains plug.
Depressurize complete systems (check all displays).
Grease / oil have to be disposed of properly.
Clean dosing valve with special thinner
CAUTION
Danger of accidents and to environment. Do not spill grease / oil. Grease / oil have to
be properly disposed of (hazardous material).
IMPORTANT
Please follow the maintenance instructions
!