Auxiliary Battery Kit w/Dual Cables
80101569
Page 6 of 6
For trailer applications with single pole socket:
Drill 1-3/4” hole in nose of trailer for trailer socket.
Mount socket to trailer with bolts and nuts provided.
Attach cable to back of socket with bolt provided.
Apply a generous amount of Dielectric Grease over
cable terminal.
Power (charge) cable from tractor batteries
to trailer must also be protected with a 150
amp circuit breaker at the tractor batteries.
GR02739
Ground trailer socket to main structure of trailer.
Use the 18” ground cable, supplied, and bolt it to the
trailer socket and suitable structure on the nose of the
trailer.
An angle has been provided, it can be used by welding it
to the crash plate, or other suitable structure.
GR01414
For all trailer applications:
After single or dual pole socket is installed:
Connect cable(s) to terminals in the battery box as
shown previously; using a 150 amp circuit breaker to
protect the charge circuit.
EO7903
Rev 05
4-2016
Single pole socket
Positive battery cable
Trailer Socket
Angle
Ground Cable
41
Summary of Contents for GT-33
Page 9: ...Chapter 3 Basic Mounting Requirements GR10132 9 ...
Page 21: ...Chapter 4 Liftgate Installation Hydraulic Schematic Single Pump Gravity Down 21 ...
Page 22: ...Chapter 4 Liftgate Installation Hydraulic Schematic Single Pump Power Down 22 ...
Page 23: ...Chapter 4 Liftgate Installation Hydraulic Schematic Dual Pump Gravity Down 23 ...
Page 24: ...Chapter 4 Liftgate Installation Hydraulic Schematic Dual Pump Power Down 24 ...