![Wallbox Eco-Smart Installation Manual Download Page 8](http://html1.mh-extra.com/html/wallbox/eco-smart/eco-smart_installation-manual_870754008.webp)
8
N
N
1
L1 L2
2
3
13 14 15 16 17 18
Installation
Wiring the System
This meter is only supported on installations with the following requirements:
• 3 wire installation: 2 hot wires + neutral
• Phase to phase voltage: 208-240 V
• Phase to neutral voltage: 120 V
Follow the diagram for wiring the system:
POWER METER INSTALLATION