15
8.
Check that everything is connected properly
in accordance with the installation manual
and local regulations.
9.
Proceed with the Software configuration. At this
point when the meter is powered up, the screen
will show a Quick Setup Menu.
Installation
3Pn ->2P
1 ->50
POWER METER INSTALLATION