Assembly and Installation
16
7. Using a 5/8” wrench and an 11/16” wrench,
reinstall the deck support arms using the re-
served hardware as shown in the
illustration. Fully tight-
en the nuts.
F350
F632
F009
LH DECK
SUPPORT ARM
5840-3
F194
F621
Deck Support Arms (LH Shown)
Reinstall Deck Support Arms
8. Using a 9/16 in. wrench, reinstall the tensioner
arm on the LH twin idler mount. Use the
illustration to ensure the
hardware is in the correct order. Fully tighten
the F013 locknut.
TENSIONER
ARM
7201-3
7201-4
5841
LH TWIN IDLER
MOUNT
F393
F051
V-GROOVE
IDLER
IDLER
PULLEY
F013
7201-3
5841
F051
Reinstall Tensioner Arm
9. Reinstall the extension spring between the
tensioner mount assembly and the tensioner
arm.
10. Lift the seat panel and reconnect the deck
support arm safety harness to the main tractor
harness.
11. Reinstall the drive tires. Torque mounting nuts
to 75-85 lb
·
ft (102 to 115 N
·
m). Lower the
tractor back onto the drive tires.
12. Reinstall the deck. Follow the instructions in
the MR21 Operator’s Manual.
13. Reinstall the Blade Drive Belt (PTO). See the
Service section of the MR21 Operator’s Manual
for details.