Assembly and Installation
14
REMOVING THE DOZER BLADE
1. On a flat surface, lower the dozer blade so it is
resting on the ground.
2. Block up the blade approximately 7” (18 cm),
and remove the top of the support straps from
the tractor chassis.
For MC(19/19i), MD, MT or MS (pre-2014)
tractors,
tighten the 3/8-16 ESNA nut (P/N
F014) to secure body hinge bolt and then back
off one turn to allow the body to open and
close.
For all other tractors,
store the hardware with
the straps on the blade for reinstallation.
3. Unblock the blade and carefully lower it to the
ground.
4. Remove the support arm hitch pins and slide
the blade off the support arms.