4
Specifications
Gas Supply Requirements
- Australia:
- New Zealand:
- UK Only:
Category:
II
2H3P.
Flue Type:
A
1.
*
Measure burner operating pressure at target top hob manifold test point with target top burner
(Inner and Outer Ring) operating at full setting. Operating pressure is ex-factory set through
appliance regulator and not to be adjusted, apart from when carrying out gas conversion, if
required. (Refer to ‘Gas Conversion’ section for details).
Natural Gas
LP Gas (Propane)
Target Top
Oven
Target Top
Oven
Input Rate (N.H.G.C.)
45 MJ/hr
30 MJ/hr
45 MJ/hr
30 MJ/hr
Gas Supply Pressure
1.13 - 3.40 kPa
2.75 - 4.50 kPa
Burner Operating Pressure (*)
1.0 kPa
2.60 kPa
Gas Connection
3
/
4
” B.S.P. Male
Natural Gas (G20)
Propane (G31)
Target Top
Target Top
Heat Input (nett)
Nominal
11.5 kW
8.0 kW
11.5 kW
8.0 kW
Reduced
4.7 kW
2.4 kW
7.9 kW
2.4 kW
Gas Rate (nett)
Nominal
1.22 m
3
/hr 0.85
m
3
/hr
0.89 kg/hr
0.62 kg/hr
Reduced
0.50 m
3
/hr 0.25
m
3
/hr
0.61 kg/hr
0.19 kg/hr
Supply Pressure
20 mbar
37 mbar
Burner Operating Pressure (*)
9.9 mbar
26.8 mbar
Gas Connection
3
/
4
” B.S.P. Male
Oven
Oven
Pilot
200W 170W 200W 150W
Pilot
0.02 m
3
/hr 0.02
m
3
/hr
0.02 kg/hr
0.01 kg/hr
Natural Gas
LP Gas
Target Top
Oven
Target Top
Oven
Input Rate (N.H.G.C.)
45 MJ/hr
30 MJ/hr
45 MJ/hr
30 MJ/hr
Gas Supply Pressure
1.13 - 3.40 kPa
2.75 - 4.50 kPa
Burner Operating Pressure (*)
1.0 kPa
2.60 kPa
Gas Connection
3
/
4
” B.S.P. Male
Summary of Contents for RN8110G
Page 8: ...6 Dimensions RN L 8110G ...
Page 28: ......