30
Gas Conversion and Specifications
Conversion Procedure
NOTE:
These conversions should only be carried out by qualified persons. All connections
must be checked for leaks before re-commissioning the appliance.
Adjustment of components that have adjustments / settings sealed (e.g. paint sealed)
can only be adjusted in accordance with the following instructions and should be
re-sealed before re-commissioning this appliance.
For all relevant information and specifications refer to table at end of this section.
Main Burners
1.
Remove main burner injectors and replace with correct
size injectors as shown in
Gas Specifications
table.
Pilot Burners
1.
Remove the following:-
Gas supply tube to the pilot burner.
NOTE:
Remove the piezo igniter electrode from
mounting bracket before unscrewing pilot supply
tube.
2.
Remove pilot burner injector and replace with correct
size injector as shown in
Gas Specifications Table
at rear of this section.
3.
Refit the following:-
Gas supply tube to pilot burner.
Piezo igniter electrode.
Ensure Appliance is isolated from gas supply before commencing servicing.
Caution
Thermocouple
Piezo Igniter
Electrode
Pilot Burner
Main Burner
Injector
Pilot Burner Gas
Supply Tube
Summary of Contents for FN8120GE
Page 37: ......