22
Gas Conversion and Specifications
Conversion Procedure
NOTE:
These conversions should only be carried out by qualified persons. All connections
must be checked for leaks before re-commissioning appliance.
Adjustment of components that have adjustments / settings sealed (e.g. paint sealed)
should only be adjusted in accordance with the following instructions and must be
re-sealed before re-commissioning this appliance.
For relevant information and gas specifications refer to table at rear of this section.
Main Burners
1.
Remove main burner injectors and replace with the
correct size injectors as shown in
Gas Specifications
table.
Pilot Burners
1. Remove the following:-
Gas supply tube to pilot burner.
NOTE: Appliances fitted with piezo igniter electrodes,
remove electrode from mounting bracket before
unscrewing pilot supply tube.
2. Remove pilot burner injector and replace with correct size
injector as shown in
Gas Specifications Table
at rear of
this section.
3. Refit the following:-
Gas supply tube to pilot burner.
Piezo igniter electrode.
Ensure Appliance is isolated from the gas supply before commencing servicing.
Caution
Thermocouple
Piezo Igniter
Electrode
Pilot Burner
Main Burner
Injector
Pilot Burner Gas
Supply Tube
Summary of Contents for Fast-Fri FN8120G
Page 29: ......