12
13
Install accessories
either vertically or
horizontally, per
manufacturer's
instructions.
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or
Solenoid
Valve
Flow
Control
Valve
or Orifice
Union
CONDUCTIVITY
ELECTRODE
¾" TEE
Flow
Control
Valve or
Orifice Union
To Drain
To Drain
1
2
3
Figure 4 Typical Boiler Installation Continuous Sampling
Install accessories
either vertically or
horizontally, per
manufacturer's
instructions.
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or Solenoid
Valve
Flow
Control
Valve or
Orifice Union
CONDUCTIVITY
ELECTRODE
¾" TEE
2 ft.
minimum
1 to 3 ft.
maximum
10 ft. max.
with minimal valves, elbows & unions
TO
DRAIN
1
2
3
Figure 3 Typical Boiler Installation Intermittent Sampling