14
15
TO ELECTRODE
TO SOLENOID
TO
CONSTANT
110 VOLTS
PE DISCHARGE
TUBING
CHEMICAL
PUMP
TO
SANITARY
SEWER
SPRAY TOWER
SPRAY
PUMP
CITY WATER
MAKEUP
SHUTOFF
VALVE
(A)
(D)
(A)
(B) (F)
(C)
(E)
(A) Unions; installed for replacement of
solenoid, strainer or probe
(B) ½" solenoid
(C) ½" Y-strainer
(D) Conductivity sensor in ¾" NPTF tee
(supplied with controller)
(E) ½" PVC bulkhead fitting
(F) winter drain
TYPICAL INSTALLATION
INTERMITTENT SAMPLING
CHEMICAL
TANK
1
2
3
Figure 6 Typical Cooling Tower Installation Intermittent Sampling
TO
110 VOLT AC
OUTLET
TO
SANITARY
SEWER
COOLING
TOWER
OPEN
SUMP
CIRCULATION
PUMP
(X) Unions; installed for replacement of
solenoid or strainer
(Y) ½" Y-strainer
(Z) ½"solenoid
TYPICAL INSTALLATION
SUBMERSION ELECTRODE
(OPTION "A")
VALVE
X
Y
Z
X
VALVE
X Y Z X
(OPTION "B")
TO
SANITARY
SEWER
PROBE
NOTE: LOCATION OF SOLENOID VALVE
USING OPTION "A" OR OPTION "B"
DEPENDS ON SYSTEM CONFIGURATION.
DETAIL OF
PROBE ASSEMBLY
CLIP PROBE
ASSEMBLY TO
SUMP WALL FOR
EASY REMOVAL
FOR CLEANING
TO
CONTROLLER
1" PVC PIPE
1" NPTF PVC
COUPLING
¾" PROBE
IN TEE
INSTALL APPROXIMATELY
HALF-WAY IN SUMP VOLUME
AVOID INSTALLATION NEAR
PUMP SUCTION INLET
CHEMICAL
PUMP
CHEMICAL
TANK
1
2
3
Figure 5 Typical Cooling Tower Installation Submersion Sensor