50
Prima Sprint
.
%
Tribo Corona
5
4
3
2
1
120
100
80
60
40
30
20
15
10
5
μA
μA
0
10
20
30
40
50
60
70
80
90
100
Ø
12
10
11
9
8
m /h
5.0
4.0
3.0
2.0
6.0
3
5.5
4.5
3.5
2.5
2.2
kV
90
80
70
60
50
40
30
20
10
100
m /h
4.0
3.0
2.0
1.0
0.5
0.4
0.3
0.2
0.1
1.5
%
Tribo Corona
5
4
3
2
1
120
100
80
60
40
30
20
15
10
5
μA
μA
0
10
20
30
40
50
60
70
80
90
100
Ø
12
10
11
9
8
m /h
5.0
4.0
3.0
2.0
6.0
3
5.5
4.5
3.5
2.5
2.2
kV
90
80
70
60
50
40
30
20
10
100
m /h
4.0
3.0
2.0
1.0
0.5
0.4
0.3
0.2
0.1
1.5
EPG
SPRINT
EPG
SPRINT
P_01122
OPERATING MANUAL
VERSION 07/2009
ORDER NUMBER DOC 2305835
6.5.6
SETTING THE CURRENT LIMITING
Above the “current limiting“ button 29 is the “current limiting“ bar graph display 2. When
the control unit is in the ready position, this display shows the set point as a dot and when
high-voltage is switched on it shows the actual value as a bar.
The current limiting is an adjustable threshold. If this threshold is exceeded, the
high-voltage is adjusted downwards until the threshold is no longer exceeded.
Procedure:
1. Press the “current limiting“ button 29
to adjust the limitation of the spray
current. The yellow LED 30 indicates
that current limiting is selected.
2. The current limiting can now be
adjusted using the Universal rotary
controller 24 between 5 µA - 120 µA
with a resolution of 1 µA. The value is
shown in the LED display 19.
2
19
24
29
30
Summary of Contents for Prima Sprint 3L
Page 2: ......
Page 96: ...96 Prima Sprint OPERATING MANUAL VERSION 07 2009 ORDER NUMBER DOC 2305835...
Page 124: ...124 Prima Sprint OPERATING MANUAL VERSION 07 2009 ORDER NUMBER DOC 2305835...
Page 125: ...125 Prima Sprint OPERATING MANUAL VERSION 07 2009 ORDER NUMBER DOC 2305835...
Page 127: ......