Procedure of commissioning:
1. Connect the electrical supply 1 to the mains.
2. Connect the pneumatic supply 2 to the compressed air generator.
3. Connect the pneumatic hose of the manual system to nipple 3.
4. Connect the grounding cable of the manual system to the grounding bus 4 and to the
grounding screw of the control unit.
5. Connect the system ground to the ground bus 4.
6. Connect the electrical cable 5 to the manual system.
7. Check the differential pressure monitor 6 and set it if required (normally, the factory
settings of 2.0 kPa; 0.02 bar; 0.29 psi; need not be changed).
8. Check the cleaning system 7 and set if required (normally, the factory settings need
not be changed).
6.1
OPERATION AND DISPLAY ELEMENTS
1
Main switch:
Switches the system on and off.
2
Ventilator ON/OFF
Attention:
Switch off the ventilator also via the
main switch.
3
Lights up red when the pressure
difference of the fi lter cleaning operation
has become excessive or a malfunction
at the ventilator motor occurs *
(also refer to chapter 8).
Electro switching cabinet:
* When the set value of 2.0 kPa (kilo Pascal) is exceeded, the display lights up red (item 3
on the electro switching cabinet).