EN
Initial start-up
BMW5500G RPA
102
3. Use the cursor keys
or
to select
“Int. vessel filling”
:
4. Press
ENTER
to confirm.
5. Then follow the instructions in the display and provided here:
Press
ENTER
to confirm.
The maximum refrigerant quantity which can be added appears in
the display.
Enter the required amount and press
ENTER
to confirm.
The internal refrigerant vessel is filled.
When the filling process is finished, this will be confirmed by an
acoustic signal after the analysis.
Close the valves and press
ENTER
to confirm.
6. After filling, the quantity of refrigerant in the internal container is dis-
played. Press
STOP
to exit the menu.
Press
STOP
again to access the standby menu. The unit is now
ready for operation.
Int. vessel filling
Flushing
Reset scales.
Service.
Connect the HP hose
to the external tank
then open the valve
ENTER-OK STOP-EXIT
Set the quantity,
then confirm!
g.
13620
ENTER-OK STOP-EXIT
WaecoBMW5500GRPA_OPM_4445102321_EMEA(de-en-es-fr-ru)_202x-xx-xx.book Seite 102 Freitag, 6. November 2020 9:04 21