Commissioning
Connecting the Wiring at the Junction Box 6.13
49
[en-US] | 02/2023 | 5100065071 | LTV 4L/6L | Operator’s Manual
wc_gr014402
1
2
3
4
5
6
7
Fig. 24: Junction box and connectors
2.
Use two wrenches to loosen the large connector
(2)
at the bottom of
the junction box.
3.
Insert the end of the coiled cord
(3)
through the P-clamp
(4)
and
through the large connector so that approximately 1 cm (3/8 in.) of the
coiled cord jacket extends into the junction box.
4.
Tighten the large connector.
5.
Slide the cord grip connector
(5)
into the winch bracket slot
(6)
and
tighten the cord grip connector using two wrenches.
Installing the light fixture cords
1.
Use two wrenches to loosen the four connectors
(7)
on the sides of the
junction box.
wc_gr014403
L1
L2
L3
L4
L1
L2
L3
L4
8
Fig. 25: Junction box connectors
2.
Insert the light fixture cords through the appropriate four connectors
(L1, L2, L3, L4). Approximately 1 cm (3/8 in.) of each light fixture cord
jacket should extend into the junction box.
3.
Tighten the four connectors.
6
Summary of Contents for LTV 4L
Page 4: ...This page is intentionally left blank...
Page 104: ...Index 104 Operator s Manual LTV 4L 6L 5100065071 02 2023 en US...
Page 105: ......