4-26
OM ET18/20/24 us 1.3 * et18_20_24i400.fm
4
Work area
Height of work area
A
: 120 cm (47 in).
Figures 99 and 100 refer to machine operation with a Wacker Neuson
hydraulic hammer.
Information
Machine operation with another attachment can modify the
height of the work area.
Installing/removing the shatter protection
1. A minimum 2 persons are required for installing/removing.
2. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
3. Install/remove shatter protection
A
from the front and fasten/remove it
at the fastening points
B
with the fastening material supplied.
4. Tighten screws
C
at fastening points
B
to 25 Nm (18 ft.lbs).
Fig. 99:
Work area with shatter protection
A
Fig. 100: Work area with shatter protection (top
view)
Fig. 101: Shatter protection (assembly)
B
B
A
Fig. 102: Shatter protection (assembly)
C
Summary of Contents for ET18
Page 12: ...1 6 OM ET18 20 24 us 1 3 et18_20_24v100 fm 1 Notes...
Page 39: ...OM ET18 20 24 us 1 3 et18_20_24e300 fm 3 11 3 Warning labels Fig 13 Warning labels Cab Canopy...
Page 44: ...3 16 OM ET18 20 24 us 1 3 et18_20_24e300 fm 3 Labels Fig 28 Labels...
Page 154: ...5 60 OM ET18 20 24 us 1 3 et18_20_24b510 fm 5 Notes...
Page 162: ...6 8 OM ET18 20 24 us 1 3 et18_20_24t600 fm 6...
Page 215: ...OM ET18 20 24 us 1 3 et18_20_24w710 fm 7 53 7 Notes...
Page 216: ...7 54 OM ET18 20 24 us 1 3 et18_20_24w710 fm 7...
Page 261: ...OM ET18 20 24 us 1 3 et18_20_24t900 fm 9 43 9 Cab canopy standard travel gear and VDS...
Page 262: ...9 44 OM ET18 20 24 us 1 3 et18_20_24t900 fm 9 Dimensions Overview ET18 ET20 ET24...
Page 266: ...9 48 OM ET18 20 24 us 1 3 et18_20_24t900 fm 9 Notes...