
7 Operation
EH 6, EHB 7
28
Operator's manual
V
e
rsion 00
1
7
Operation
7.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
f
Check the machine and all components for damages.
Checking the mains
f
Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter
Technical Data
).
f
Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety information
.
WARNING
Electrical voltage.
Injuries from electrocution.
f
Remove the plug from the plug receptacle before all work on the machine.
Summary of Contents for EH 6
Page 1: ...Operator s manual Electric hammer EH 6 EHB 7 November 2008 0217536en 001...
Page 2: ......
Page 54: ...12 Technical data EH 6 EHB 7 54 Operator s manual Version 001...
Page 56: ......
Page 59: ......
Page 60: ......