BA 5001-6001 US – Edition 1.2 * 6001b510.fm
5-1
Maintenance
5 Maintenance
5.1
Introduction
Operational readiness and the service life of machines are heavily dependent on
maintenance.
It is therefore in the interest of the machine owner to perform the prescribed maintenance
work.
Before performing service and maintenance work, always read, understand and follow the
instructions given in:
• Chapter 2 “SAFETY INSTRUCTIONS” of this Operator's Manual
Perform the prescribed inspections and rectify any disorders before putting the machine
into operation.
Secure open (engine) covers appropriately. Do not open (engine) covers on slopes or in
strong wind.
When using compressed air, dirt and debris may be blown into your face. Therefore, wear
protective glasses, masks and clothing when using compressed air.
Daily service and maintenance work and maintenance according to maintenance plan
“A”
must be performed by a specifically trained operator. All other maintenance work must be
performed by trained and qualified staff only.
The maintenance plans indicate when the maintenance work mentioned below must be
performed
– see
Maintenance plan (overview)
on page 5-35.
Summary of Contents for Dumper 5001
Page 8: ...I 6 BA 5001 6001 US Edition 1 2 Ba6001us1_1SIX fm Index...
Page 15: ...BA 5001 6001 US Edition 1 2 6001b110 fm 1 7 Introduction 1 7 Swivel dump bucket 5001 6001...
Page 16: ...1 8 BA 5001 6001 US Edition 1 2 6001b110 fm Introduction 1 8 Front dump bucket 6001...
Page 32: ...2 12 BA 5001 6001 US Edition 1 2 6001b210 fm Safety Information...
Page 118: ...5 40 BA 5001 6001 DE Edition 1 2 6001b560 fm Maintenance...