
BS 60-2 / BS 70-2
Operation
wc_tx000921gb.fm
23
4
Operation
4.1
Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1
Make sure all loose packaging materials have been removed from the
machine.
4.1.2
Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3
Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4
Attach component parts not already attached.
4.1.5
Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6
Move the machine to its operating location.
Summary of Contents for BS 70-2
Page 1: ...Operator s Manual Rammer BS 60 2 BS 70 2 5000184135 06 0411 5 0 0 0 1 8 4 1 3 5 EN...
Page 6: ......
Page 16: ...Labels BS 60 2 BS 70 2 16 wc_si000475gb fm 2 Labels 2 1 Label Locations...
Page 22: ...Lifting and Transporting BS 60 2 BS 70 2 22 wc_tx001479gb fm Notes...
Page 31: ...BS 60 2 BS 70 2 Maintenance wc_tx000926gb fm 31 wc_gr001168 a b c d k i h...
Page 42: ...Technical Data BS 60 2 BS 70 2 42 wc_td000286gb fm...
Page 48: ......
Page 49: ......