
Labels
BS 60-2 / BS 70-2
20
wc_si000475gb.fm
M
This rammer engine requires a two-cycle gasoline/oil
mixture (50:1)
With standard two-cycle oil use 50:1 ratio.
With Wacker Neuson Neuson two-cycle or other oil
meeting the NMMA TC-W3 specification, a ratio from
50:1 to 100:1 can be used.
This label is molded into the cover. If the label
becomes illegible, the cover must be replaced.
Refer to the Parts Book for ordering information.
N
Turtle = Idle/slow engine speed
Rabbit = Full/fast engine speed
This label is molded into the cover. If the label
becomes illegible, the cover must be replaced.
Refer to the Parts Book for ordering information.
O
1. Move the throttle to the IDLE position.
2. Close the choke.
--
This machine may be covered by one or more patents.
Ref. Label
Meaning
Summary of Contents for BS 70-2
Page 1: ...Operator s Manual Rammer BS 60 2 BS 70 2 5000184135 06 0411 5 0 0 0 1 8 4 1 3 5 EN...
Page 6: ......
Page 16: ...Labels BS 60 2 BS 70 2 16 wc_si000475gb fm 2 Labels 2 1 Label Locations...
Page 22: ...Lifting and Transporting BS 60 2 BS 70 2 22 wc_tx001479gb fm Notes...
Page 31: ...BS 60 2 BS 70 2 Maintenance wc_tx000926gb fm 31 wc_gr001168 a b c d k i h...
Page 42: ...Technical Data BS 60 2 BS 70 2 42 wc_td000286gb fm...
Page 48: ......
Page 49: ......